Written answers

Wednesday, 10 July 2024

Department of Health

Healthcare Infrastructure Provision

Photo of David CullinaneDavid Cullinane (Waterford, Sinn Fein)
Link to this: Individually | In context | Oireachtas source

390. To ask the Minister for Health the full cost of delivering each of the acute bed units completed in 2023 and to date in 2024; the number of acute beds delivered in each project; the full disaggregated cost, by cost type; and the cost per annum for each project. [30400/24]

Photo of Stephen DonnellyStephen Donnelly (Wicklow, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

As this is a service matter, I have asked the Health Service Executive to respond to the Deputy directly, as soon as possible.

Photo of David CullinaneDavid Cullinane (Waterford, Sinn Fein)
Link to this: Individually | In context | Oireachtas source

391. To ask the Minister for Health the annual all-in cost of an acute inpatient bed. [30401/24]

Photo of Stephen DonnellyStephen Donnelly (Wicklow, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

As this is an operational matter, I have asked the Health Service Executive to respond to the Deputy directly, as soon as possible.

Comments

No comments

Log in or join to post a public comment.