Thomas Byrne (Meath East, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
133. To ask the Minister for Education and Skills the progress of refurbishment works at Dundalk IT. [41143/19]
Joe McHugh (Donegal, Fine Gael)
Link to this: Individually | In context | Oireachtas source
The refurbishment of the North & South Blocks at Dundalk IT will be delivered in phases over the period up to 2023. The project design team was appointed in Q2 2019 and it is anticipated that work will commence on site in Q3 2020. Delivery of this project is devolved to Dundalk IT.
Thomas Byrne (Meath East, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
134. To ask the Minister for Education and Skills the progress of fitting out the building works at a college (details supplied). [41144/19]
Joe McHugh (Donegal, Fine Gael)
Link to this: Individually | In context | Oireachtas source
The enabling work element of phase 1 of the LIT Coonagh Engineering Facilities is completed. The fit out work element of phase 1 is due to go to tender in Q4 2019. This project is devolved to LIT for delivery.
Thomas Byrne (Meath East, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
135. To ask the Minister for Education and Skills the progress of refurbishment works at a campus (details supplied). [41145/19]
Joe McHugh (Donegal, Fine Gael)
Link to this: Individually | In context | Oireachtas source
Work has commenced on the refurbishment of the GMIT Castlebar Campus. Stage 1 of the works is due to be completed this month. This project is devolved to GMIT for delivery.