Written answers

Thursday, 28 January 2016

Department of Environment, Community and Local Government

Consultancy Contracts Data

Photo of Lucinda CreightonLucinda Creighton (Dublin South East, Renua Ireland)
Link to this: Individually | In context | Oireachtas source

345. To ask the Minister for Environment, Community and Local Government the name, costs, date of commission, date or expected date of publication and name of the external consultant of all external reports commissioned by his Department since March 2011. [3766/16]

Photo of Alan KellyAlan Kelly (Tipperary North, Labour)
Link to this: Individually | In context | Oireachtas source

The information requested is set out in the following table.

Date of Commission
Consultant/Author etc.
Name/Description of Report/Review/Study
Date or Expected Date of Publication
Amount Spent Since March 2011
March 2011 Building Research Establishment Ltd Retrofitting Code of Practice. Published March 2014.
(1) €21,190
March 2011 Malachy Walsh & Partners EIS Screening Report for site at Valentia. The report is not intended to be published as it is a technical report relating to a site on Valentia Island where Met Éireann are building an Air Monitoring Facility.
€6,336
March 2011 White Young Green Annual Dust Impact Assessment Report (2011) at the Former Irish Steelworks Site, Haulbowline, Cobh, Co. Cork. Published March 2012.
( 2 ) See footnote
April 2011 Housing & Sustainable Communities Ltd. Toolkit for Local Authorities on regeneration. Not intended for publication. This was a report intended to provide assistance to Local Authorities in drawing up proposals for the regeneration of their areas.
€12,300
May 2011 Indecon Regulatory Impact Analysis of proposed regulations for household food waste. Published June 2012.
€24,725
June 2011 Barrow Archaeological Services Archaeological reports on Met Éireann site at Valentia. The report is not intended to be published as it is a technical report relating to a site on Valentia Island where Met Éireann are building an Air Monitoring Facility.
€1,210
June 2011 National Standards Authority of Ireland (NSAI) Audit reports for ISO9001:2008 in 2011 and 2012. Not intended for publication.
€6,699
June 2011 Price Waterhouse Coopers Independent assessment on establishment of National Water Utility. Irish Water - Phase 1 report and appendices published January 2012. Implementation Strategy published December 2012.
€179,584
June 2011 Tobin Consulting Engineers National Litter Pollution Monitoring System - 2011 Report. Published April 2012.
€61,077
July 2011 Murtagh & Partners Review of Dublin Region Homelessness Services and Funding in 2011. Published October 2011.
€27,800
August 2011 Certification Europe Ltd. Compost Quality Assurance Scheme. Published October 2012.
€139,142
September 2011 Dr. Eoin O'Sullivan, Trinity College Dublin Review of the Homeless Strategy 2008-2013. Published November 2012.
€6,000
September 2011 Marine Institute Marine Strategy Framework Directive (1) Initial Assessment;

(2) Development of a Monitoring Programme; and (3) Development of a Programme of Measures necessary to achieve Good Environmental Status in Irish Marine Waters.

(1) Initial Assessment - the technical report was published on the Department's website in Q2 2013 and the summary report was published in Q4 2013.

(2) Monitoring Programme – sent to the EU Commission in April 2015.

(3) Drawing up of programme of Measures to be completed Q1 2016.

(3) €2,676,479
September 2011 Pyrite Panel Report of the Pyrite Panel - Independent report to provide options for the Minister to deal with the pyrite problem. Published July 2012.
€22,719
October 2011 Pembroke Communications Advise on, and assist tendering process for, Tidy Towns sponsorship. No formal report due for publication.
€4,560
October 2011 SKM Enviros Irish Recycled Plastic Waste Arisings Study. Published September 2011.
€37,566
November 2011 ARUP Consulting Engineers Study in respect of provision of fire detection and alarms systems in dwellings. Not intended for publication. It is a technical report, to inform work in the Department.
€29,935
December 2011 RPS Group Provision of expertise concerning Strategic Environmental Assessment and Appropriate Assessment techniques for the evaluation and revision of Regional Waste Management Plans. No formal document due for publication. The work comprises principally advice, guidance documents and technical expertise.
€45,223
December 2011 Secretariat to the National Economic and Social Council of Ireland Analysis on national climate policy. Interim report released October 2012; final report released in February 2013.
Nil
2011 Mr. David Lovegrove 2011 Report of the Dormant Accounts Board. Published July 2012.
€9,689
January 2012 Fehilly Timoney & Company Bulky Waste Reuse Best Practice - Feasibility Study. Published July 2013.
€55,289
January 2012 Inter-Departmental Group Design of a Local Property Tax – Report of the Inter-Departmental Group. Published December 2012.
Nil
January 2012 Mr. Seamus Woulfe SC Review of the management by the Department of an application by Wicklow County Council for loan approval in respect of the compulsory purchase of land at Charlesland, Co. Wicklow - Phase 1. Published March 2012.
€19,680
February 2012 Version 1 Evaluation of ICT Disaster Recovery configuration and capability. Not intended for publication.
€9,363
March 2012 Economic and Social Research Institute (ESRI) Analysis of Property Tax Options - a report to the Interdepartmental Expert Group on Property Tax. Published December 2012.
€60,280
March 2012 Housing and Sustainable Communities Agency Review of leasing model. Date of publication to be decided.
€1,937
March 2012 RPS Group All Island Used Tyre Survey. Published March 2013.
(4) €17,673
April 2012 Glas Ecology Environment Management Plan (Breeding Chough and Peregrine Survey, Valentia Island, Co. Kerry). The report is not intended to be published as it is a technical report relating to a site on Valentia Island where Met Éireann are building an Air Monitoring Facility.
€4,920
April 2012 Munster Archaeology Report on archaeological investigation/survey of Met Éireann site at Valentia. Not Intended for publication. Report for internal use only.
€47,289
April 2012 Padraic Thornton Planning & Environmental Consultancy Preparation of EIA Guidelines. Published March 2013.
€7,200
May 2012 DKM Economic Consultants Review of Part V of the Planning and Development Act 2000. Published July 2013.
€39,690
May 2012 Indecon Feasibility study on a Tenancy Deposit Protection Scheme. Published November 2012.
(5) €42,706
May 2012 Tobin Consulting Engineers National Litter Pollution Monitoring System - 2012 Report. Published April 2013.
€58,271
June 2012 Mr. Seamus Woulfe SC Review of the compulsory acquisition of land by Wicklow County Council at Charlesland, Co. Wicklow - Phase 2. Published April 2013.
€49,200
June 2012 RPS Group Review of the Producer Responsibility Model in Ireland. Final report published in July 2014.
€292,306
September 2012 Commission for the Economic Development of Rural Areas (CEDRA) Commission for the Economic Development of Rural Areas report on how to support the economic development of rural Ireland. Published April 2014.
(6) €20,702
October 2012 Mr. Hendrik W van der Kamp Independent Evaluation of the Planning Review Report 2012. Published January 2013.
€12,096
November 2012 AECOM Cost optimal study for non-domestic buildings. Published March 2013.
€53,517
November 2012 Flynn Furney Consultants Ltd. Environmental Management Services re: review of CEMP at Valentia Site (Method Statement). The report is not intended to be published as it is a technical report relating to a site on Valentia Island where Met Éireann are building an Air Monitoring Facility.
€3,167
2012 Mr. David Lovegrove 2012 Report of the Dormant Accounts Board. Published March 2013.
€1,120
January 2013 Economic and Social Research Institute (ESRI) Affordability aspects of the provision of water services in Ireland and subsequent analysis. Published in May 2014 as Appendix 2 and Appendix 5 of the "Report of the Inter-Departmental Working Group on Affordability Measures".

€57,655
January 2013 Userneeds Usage survey on the Met Éireann website. Not intended for publication - this was a report volunteered to Met Éireann by the survey company on a 'sample' basis.
Nil - provided as a 'free sample'
April 2013 KW Research & Associates NTACC Research into why Travellers leave Traveller-specific accommodation. Published on the Department's website April 2014.
€11,938
May 2013 Garrett Fennell Solicitor Independent Review of the registration arrangements for Architects under the Building Control Act 2007. Published on the Department's website.
Nil (report produced on a pro-bono basis)
May 2013 Tobin Consulting Engineers National Litter Pollution Monitoring System - 2013 Report. Published June 2014.
€52,014
June 2013 Economic and Social Research Institute (ESRI) & University College Cork (UCC) Technical support on developing low carbon sector roadmaps for Ireland. The project relates to technical support, with no formal document due for publication.
€107,552
June 2013 Environmental Protection Agency (EPA) Article 29(2) Report on

Progress on Implementation of the EC (Good Agriculture Practices for the Protection of Waters) Regulations 2010.

Published April 2014.
Nil
June 2013 Housing and Sustainable Communities Agency Business Process Design of the Housing Assistance Payment. Date of publication to be decided.
€54,938
July 2013 Housing and Sustainable Communities Agency Review of CALF assessment process. Date of publication to be decided.
€11,675
July 2013 Indecon Assessment of Potential Merits of New Initiative re Purchase of Local Authority Houses by Existing Tenants. Not intended for publication.
Nil (report produced on a pro-bono basis)
July 2013 SLR Environmental Consulting (Ireland) Ltd/National Economic and Social Council (NESC) Wind Energy in Ireland: Building Community Engagement and Social Support. Published July 2014.
€50,451
September 2013 RPS Group Public consultation process on the Marine Strategy Framework Directive and producing a report. Published November 2013.
€9,000
November 2013 AP Env Econ Limited/National Economic and Social Council (NESC) Ireland’s Environmental Data: Inventory, Assessment and Next Steps. Published April 2014.
€35,178
December 2013 Economic and Social Research Institute (ESRI) & University College Cork (UCC) Technical support for the purposes of advising Government on the proposed 2030 EU Framework for Climate and Energy Policies. This report was published in June 2015 as part of the consultation on the National Mitigation Plan to transition Ireland to a low carbon economy by 2050.
€67,768
February 2014 MacCabe, Durney Barnes Independent Planning Review. Published December 2015.
€94,521
February 2014 Ricardo-AEA NSMC Residential Solid Fuel Study. Expected to be published in February 2016.
(7) €16,475
May 2014 Glas Ecology Environment Management follow up Report (Breeding Chough and Peregrine Survey, Valentia Island, Co. Kerry). The report is not intended to be published as it is a technical report relating to a site on Valentia Island where Met Éireann are building an Air Monitoring Facility.
€1,599
May 2014 Padraic Thornton Planning & Environmental Consultancy Independent Review of Draft S31 Directions in Westmeath. Published May 2014.
€5,000
May 2014 Tobin Consulting Engineers National Litter Pollution Monitoring System - 2014 Report. Published July 2015.
€52,014
June 2014 Institute of Public Administration (IPA) Peer review of Met É ireann's Operational and Strategic Review. This report is not intended for publication.
€4,920
July 2014 Patricia Thornton

Tom Philips Associates
Independent Review of Draft S31 Directions in Limerick. Published August 2014.
€4,151
July 2014 University College Cork (UCC)/National Economic and Social Council (NESC) Review of Environmental Social Policy Literature. Published July 2015.
€4,305
October 2014 National University of Ireland Galway (NUIG)/National Economic and Social Council (NESC) Environmental Policy Integration: Case Studies Research. Report is being considered by NESC Council.
€38,222
October 2014 National University of Ireland Galway (NUIG)/National Economic and Social Council (NESC) Sustainable Urban Development. Published July 2015.
€20,303
December 2014 Economic and Social Research Institute (ESRI) Socio-Economic Impact of a nuclear accident in the UK. The intention is that the report will be published, but the specific date is not yet known.
79,950
December 2014 National Institute for Public Health and the Environment - Netherlands (RIVM) Electromagnetic Fields in the Irish Context. Expected to be published in Q1 of 2016.
(8) See footnote
January 2015 AECOM Additional cost optimal calculations for domestic and non-domestic buildings. Published February 2015
€33,683
February 2015 Dr. Dagmar Stengel Best practice in relation to the sustainable exploitation and management of intertidal seaweed resources.  Not intended for publication.
€14,391
March 2015 ILC Sports and Recreation Review of Comhairle na Tuaithe and the implementation of the National Countryside Recreation Strategy. Publication to be considered.
€15,341
April 2015 Deloitte Business Case Review for the Housing Assistance Payment (HAP). Date of publication to be decided.
€28,939
May 2015 Tobin Consulting Engineers National Litter Pollution Monitoring System - 2015 Report. Expected to be published July 2016.
€24,539
July 2015 Independent Review Group An Bord Pleanala - Organisational Review. Expected to be published in February 2016.
€5,000
July 2015 RPS Group Strategic Environmental Assessment (SEA) and Appropriate Assessment (AA) services on the National Mitigation Plan. November 2016.
(9) €23,192
September 2015 Behaviour & Attitudes Ltd. Market Survey to determine weather forecast consumption behaviour of the Irish public. Not intended for publication. Extracts may be published in the future.
€19,865
September 2015 IT Executive Focus Review of the Structure and Delivery Model of the ICT Services for the Department of the Environment, Community and Local Government. Not intended for publication.
€33,173
September 2015 Rory Mulcahy, Senior Counsel Review Report in relation to Certain Planning Matters in respect of Donegal County Council Issue of publication to be considered following completion of report.
€0
September 2015 Steering Group on Fire Safety Review (Chaired by Martin Riordan) Review of Fire Safety arrangements in multi-unit developments where concerns arise regarding non-compliance with statu t ory requirements. Date of publication to be decided.
€25,000
October 2015 Mazars Consulting Inde pendent Review of Homeless Services (2015). Expected to be published on the Department's website in early 2016.
€27,075
November 2015 DKM Economic Consultants Household Waste Management Costs in Ireland. Q1 2016
€10,763
November 2015 MartinPlan Consulting To consider the implications of the C-50 judgment in the context of waste water discharge licensing and to make any necessary recommendations. Not expected to be published
€1,750
January 2016 Des Johnson Independent Review of Draft S31 Direction in Louth. Expected to be published in February 2016.
€0

(1) The contract was in conjunction with the Sustainable Energy Authority of Ireland. Total cost of the study is €169,302 (inclusive of VAT). My Department's contribution was €21,190 (inclusive of VAT) with the balance met by the Sustainable Energy Authority of Ireland (i.e. €148,112 inclusive of VAT).

(2) My Department previously provided funding to Cork County Council to support the production of an annual Dust Impact Assessment Report at the former Irish Steel site at Haulbowline Island. Following a Government Decision in June 2011, the Department of Agriculture, Food and the Marine assumed the lead role in relation to the remedial works necessary to be undertaken on the site. Accordingly, funding provided to Cork County Council for the annual Dust Impact Assessment Report 2011 and subsequent years is a matter for the Ministerfor Agriculture, Food and the Marine.

(3) The Initial Assessment report, monitoring programme and programme of measures each arise from a broader process connected with Ireland’s obligation to implement the EU Marine Strategy Framework Directive (MSFD). The work primarily consists of a determination of the status of Ireland’s marine waters, the measures necessary to achieve, or maintain, the required Good Environmental Status by 2020 and a programme to monitor this. The preparation of a draft Initial Assessment (under Art. 8 of the MSFD) including proposals for Good Environmental Status (Art. 9) and for draft Environmental Targets (Art.10) is underpinned by a suite of monitoring measures to measure the maritime environment against these targets (Art. 11). Where human activities are preventing these targets from being met, a Programme of Measures is in the process of being drawn up to mitigate the effect of these activities, or halt t hem as appropriate (Art.13). A draft Programme of Measures document is currently available on the Department's Website for public consultation.

(4) Survey jointly commissioned and funded by Department of the Environment in Northern Ireland and my Department.

(5) This report was co-funded by my Department and the Private Residential Tenancies Board. The cost to my Department of €42,706 represents 50% of the total cost.

(6) This report has been co-funded by my Department, Teagasc and the Western Development Commission. The cost to my Department of € 20,702 represents 40% of the overall expenditure.

(7) This report has been commissioned by my Department under the auspices of the North South Ministerial Council and in conjunction with the Department of the Environment for Northern Ireland. The cost is being evenly split and the final charge to my Department is estimated at €40,000.

(8) The cost of this project , which is estimated at €66,950, will be m et by the Department of Communications, Energy and Natural Resources.

(9) The Report will cost €90,440 in total (including 23% VAT) and is being co-funded on an equal share basis by the Departments of Transport, Energy and Agriculture.

Comments

No comments

Log in or join to post a public comment.