230. To ask the Minister for Finance the amounts Ireland received from the European Investment Bank for each year since 2008; and if he will provide a breakdown by project of what this money funded or part-funded. [2955/14]

Photo of Michael NoonanMichael Noonan (Limerick City, Fine Gael)
Link to this: Individually | In context | Oireachtas source

The Deputy will find below a table with a breakdown of Irish projects assisted by the European Investment Bank (EIB) including: the amounts for loans approved; the approval date; the sector involved; and the signature dates for the loans approved in respect of the period 2008 2013.

The Deputy should note that the total amount of EIB support in a particular year may include loans approved by the Board in that year as well as signatures in respect of loans approved in previous years.

ProjectSectorApproval DateSignature DateAmount (EURm) ApprovedAmount (EURm) Signed
AIB Renewable Energy Framework LoanEnergy19-Nov-13100
Dublin Cross City Luas ProjectTransport25-Oct-13163
Grangegorman PPPInfrastructure22-Oct-13110
ESB Renewable ConnectionEnergy17-Sep-1309-Dec-13200100
University of LimerickEducation12-Jul-1326-Nov-13100100
Vodafone Mobile LimitedCorporate23-Jul-1327-Nov-13120118
Irish School Programme IIEducation23-Apr-1319-Jun-13100100
N11/N7 Motorway PPPInfrastructure14-Jul-1030-Apr-1372
AIB Loan for SMEs and MidcapsSMEs20-Nov-1226-Apr-13100
Bord Gáis Onshore Wind ProgrammeEnergy07-Dec-1223-Apr-1390
EIF Development Capital Fund IrelandEIF16-Sep-134040
-Total933720
Total net funding approved and/or signed in 2013: 1,193m

2012

ProjectSectorApproval DateSignature DateAmount (EURm) ApprovedAmount (EURm) Signed
AIB Loan for SMEs and MidcapsSMEs20-Nov-1221-Dec-12200100
Bord Gáis Onshore Wind ProgrammeEnergy07-Dec-1223-Apr-1390
Bord Gáis Onshore Wind ProgrammeEnergy07-May-1228-Nov-12155155
Irish Water Investment ProgrammeEnergy26-Oct-1228-Nov-12200100
Irish Schools Investment ProgrammeEducation21-Jun-1209-Nov-1250
Irish School Programme Education05-Jun-1206-Jul-12100100
Bank of Ireland Loan for SME IISMEs15-Mar-12100
EIF Funding91.1
-Total936.1505
Total net funding approved and/or signed in 2012: 986.1m

2011

ProjectSectorApproval DateSignature DateAmount (EURm) ApprovedAmount (EURm) Signed
AIB Loan for SMEs IISMEs16-Nov-1021-Dec-11150
University College DublinEducation10-May-1117-Nov-119090
ESB Network and E-Cars InfrastructureEnergy15-Nov-1117-Nov-11235235
Irish Schools Investment ProgrammeEducation21-Jun-1150
-Total375475
Total net funding approved and/or signed in 2011: 525m

2010

ProjectSectorApproval DateSignature DateAmount (EURm) ApprovedAmount (EURm) Signed
AIB Loan for SMEs IISMEs16-Nov-10150
Car Efficiency and Safety RDI RSFFIndustryDate not available01-Oct-101515
Bord Gáis Whitegate CCGTEnergy18-Dec-0902-Jul-10197
Irish Schools Investment ProgrammeEducationDate not avaiable02-Jun-104444
N11/N7 Motorway PPPInfrastructure14-Jul-1075
N17/N18 Motorway PPPInfrastructure11-May-10170
Dublin Metro PPP ProjectInfrastructure11-May-10500
-Total954256
Total net funding approved and/or signed in 2010: 1,151m

2009

ProjectSectorApproval DateSignature DateAmount (EURm) ApprovedAmount (EURm) Signed
Bord Gáis Whitegate CCGTEnergy18-Dec-09197
Dublin Airport Terminal 2 (TEN)Transport14-Jul-0910-Nov-09260260
ESB Renewable ProgrammeEnergy18-Sep-0928-Sep-09200200
Eirgrid East-West Interconnector TEN-EEnergy22-Sep-0928-Sep-09300300
Bank of Ireland Loan for SME ISMEs12-Mar-0925-Mar-09100100
AIB Loan for SME ISMEs12-Mar-0925-Mar-09100100
Ulster Bank Loan for SME ISMEs12-Mar-0924-Mar-096060
-Total12171020
Total net funding approved and/or signed in 2009: 1,217m

2008

ProjectSectorApproval DateSignature DateAmount (EURm) ApprovedAmount (EURm) Signed
Trinity College Dublin (Bioscience Building)Education26-Sep-0827-Nov-087575
ESB Aghada Gas Fired Power StationEnergy25-Jul-0826-Nov-08175175
Dublin Airport Development -TENTransport20-Jun-08200
Total250450

Total net funding approved and/or signed in 2008: 450m