Deputy O'Donnell's response indicates the unsatisfactory nature of the Adjournment debate. However, I welcome the Minister, Deputy Eamon Ryan, and wish him well in his new position. He will be hearing plenty from me on this and other issues concerning my constituency. The future of the ESB power station in Shannonbridge, West Offaly Power, is crucial to the development of County Offaly and the midlands region as a whole. I hope the Minister is aware that there has been a long history of semi-State employment in County Offaly, both through the ESB and Bord na Móna, although the numbers employed in both companies have been reduced significantly in the past decade.

Shannonbridge power station was well served by its staff during its period of operation. It closed to make way for West Offaly Power, with major job losses, which caused difficulties in the county. Although I was not involved in politics at the time, I know that closure was difficult to accept, but it was accepted by local people. West Offaly Power is now in place with a sister station in Lanesboro. West Offaly Power employs in the region of 47 people. The Minister will be aware that his own party objected to the construction of the plant in the first place, but I am sure that will not be an issue for him now. Both power stations have been opened for less than three years, and both are off-line for the second time in that period. The Minister will be aware that they were built at a cost to the taxpayer of almost €500 million. I fully support them and I lobbied for the Shannonbridge station to be built. I lobbied for a station that would work, however, and that would do the job it was designed to accomplish.

In 2006, the problem was in the boiler area. This time, the problem is in the 25 tonne destock cylinder area. I am not here to make cynical points and I do accept that extracting energy from peat is a complicated process. Such extraction processes have been under way since the mid-1940s, although I accept that the process has changed in the new stations. Their aim was to reduce emissions and they were achieving that. It is unacceptable, however, that both stations have closed again for the second time in three years.

Safety for the staff, both in Shannonbridge and Lanesboro, must come first. That is the paramount objective. The health and safety concerns that have resulted in the stations' closure are understandable and I acknowledge that they must be off-line at present. I have several questions for the new Minister and I hope he will set a precedent of answering questions of concern to Members, rather than just giving us a prepared speech.

Photo of Kieran O'DonnellKieran O'Donnell (Limerick East, Fine Gael)
Link to this: Individually | In context

Hear, hear.

Photo of Olwyn EnrightOlwyn Enright (Laois-Offaly, Fine Gael)
Link to this: Individually | In context

What investigations have the Minister and his Department carried out into the situation both at Shannonbridge and Lanesboro? What is the timeline for getting West Offaly Power back into action and when can we expect the plant to be in action again? Has the Minister had discussions with management both in the ESB and Bord na Móna about the possible effects on employment in West Offaly Power and the Bord na Móna stations supplying it with peat? It is important to consider the potential knock-on effect for permanent and seasonal jobs in Bord na Móna as well as the jobs at West Offaly Power. I appreciate that there are commercial sensitivities involved, but my primary concern is for the job security of my hard-working constituents who have been loyal to the ESB and Bord na Móna in the past.

I am sure the Minister does not want to start his new term in office involved in arbitration between two companies under his control. He should address the issues I have raised. I would like him to confirm the expected date for the resumption of West Offaly Power. Will he also confirm that there will be no knock-on effects, either for the staff at West Offaly Power or the larger number of permanent and seasonal staff working for Bord na Móna? Their jobs are dependent on the last two remaining power stations under the control of the ESB. Edenderry Power also uses peat fuel.

I look forward to the Minister's response, although I do not need him to get into the technical details, which has been well explained to me already. I want him to answer the key issues as to who is responsible for the problems we are experiencing and when the plants will reopen. Will the Minister guarantee that there will be no job losses as a result of the current situation?

Photo of Eamon RyanEamon Ryan (Dublin South, Green Party)
Link to this: Individually | In context

I hope my reply will answer some of the questions raised by Deputy Enright. This is an issue of importance, not just locally but nationally also. We are close all the time to not having enough power, so as well as the jobs issue, there is the question of security of supply from electricity generation. It is a crucial matter.

The operation and maintenance of the ESB's power stations is a matter for the company and not one in which I have a direct function. However, following notification from the ESB earlier this month that its West Offaly and Lough Ree peat power plants at Shannonbridge and Lanesboro were experiencing outages on safety grounds, my predecessor, Deputy Noel Dempsey, requested that the Department's chief energy technical adviser undertake an assessment of the situation. I have received this report which was carried out with the full co-operation of the ESB.

Given the legal contractual position between the ESB and the main contractor, the report is purely factual and does not make any determination as to the reasons for the plant problems. I have asked the chief energy technical adviser to continue to liaise with the ESB on developments.

I am advised by the ESB that unexpectedly high levels of corrosion have been found in the 150 MW peat-burning West Offaly Power station at Shannonbridge, County Offaly, and its 100 MW sister plant, Lough Ree Power at Lanesboro.

The ESB went to open competitive tender to build these plants to a high specification that met the most up-to-date environmental requirements. The international engineering company, Foster Wheeler, won the competitive bidding process. Similar technology was offered by other tenders and the ESB's assessments included visits to peat-burning reference plants in Finland, which were operating satisfactorily.

Foster Wheeler built and commissioned Lough Ree Power and West Offaly Power, and the plants were operational from December 2004 and June 2005, respectively. The burning of peat allowed greater diversity of fuels to be used in electricity generation as oil and gas prices reached record levels. It also ensured greater security of supply. In order to achieve lower emissions, an internationally proven technology, a circulating fluidised bed boiler, was employed in the two peat stations. Simply put, this process facilitated burning the peat fuel at lower temperatures.

With both plants still under warranty, in late 2005 the ESB discovered the development of corrosion in the high temperature section of the boiler in West Offaly Power. This was confirmed in early 2006. A similar corrosion was discovered in Lough Ree Power in spring 2006. These developments required outages to allow remedial repair work to take place and both plants returned to service.

The ESB also commenced a programme of work with Foster Wheeler to determine the root cause of the corrosion and to identify a long-term technical solution. This work is ongoing.

During a scheduled outage at Lough Ree Power in May 2007, extensive corrosion was found in the flue gas cleaning equipment of the plant. Arising from this discovery, an assessment was carried out in West Offaly Power and similar levels of corrosion were discovered in that plant.

On the basis of these findings, on 1 June 2007, the ESB was advised by Foster Wheeler to take West Offaly Power out of service at once for safety reasons. I understand the ESB and Foster Wheeler are working together to resolve the technical problem. Experts have been engaged to study the processes at both plants with a view to finding a long-term solution. The ESB is also working with my Department in investigating these issues.

The company assures me it wishes to ensure these temporary outages last no longer than absolutely necessary but the safety imperative makes it impossible to avoid loss of production while it seeks to solve the problem. I am also kept informed of any resultant implications for security of supply in regard to electricity. In accordance with their statutory responsibilities, the power generation situation is continually monitored by the Commission for Energy Regulation, CER, and the independent transmission system operator, EirGrid, and is carefully managed from EirGrid's national control centre.

I am advised by CER and EirGrid that in addition to the outages at Lough Ree Power and West Offaly Power, and as a normal part of the management regime, the summer maintenance season is currently under way with a number of generators taking outages for maintenance work. While I understand these outages can lead to concern at times for the adequacy of the generation margin, I am assured the situation is under control and being carefully managed by EirGrid to ensure that capacity meets demand at all times.

The most recent advice available to me from the CER and EirGrid is that there is sufficient generating capacity, both installed and planned, on the system to meet the predicted demand for the period ahead. Notwithstanding this assessment, the expected balance between demand and supply is being kept under consistent collective review by my Department in consultation with the CER and EirGrid.

Should there be any indication that the situation regarding generation adequacy may change, the CER is charged with the responsibility of taking action to ensure supplies of electricity are protected. I am also aware the outages at West Offaly and Lough Ree have implications for Bord na Móna, which has a commercial agreement with ESB to supply fuel to the West Offaly Power plant. Under the agreement, the company normally supplies 25,000 tonnes of milled peat per week to West Offaly Power. The closure of the power station has meant a loss of revenue to Bord na Móna of approximately €700,000 per week.

Photo of Olwyn EnrightOlwyn Enright (Laois-Offaly, Fine Gael)
Link to this: Individually | In context

Not insignificant.

Photo of Eamon RyanEamon Ryan (Dublin South, Green Party)
Link to this: Individually | In context

No. The manner in which the provisions of their commercial agreement apply to the current situation is a matter for the two companies to work out.

Photo of Olwyn EnrightOlwyn Enright (Laois-Offaly, Fine Gael)
Link to this: Individually | In context

They are both under the Minister's watch.

Photo of Eamon RyanEamon Ryan (Dublin South, Green Party)
Link to this: Individually | In context

They are indeed.

The Dáil adjourned at 9.45 p.m. until 10.30 a.m. on Thursday, 5 July 2007.