Written answers

Tuesday, 29 July 2025

Department of Public Expenditure and Reform

Flood Risk Management

Photo of Ruairí Ó MurchúRuairí Ó Murchú (Louth, Sinn Fein)
Link to this: Individually | In context | Oireachtas source

826. To ask the Minister for Public Expenditure and Reform if he will detail each allocation made to Louth County Council under the OPW’s minor flood mitigation works and coastal protection scheme for the years 2013 to 2025, in tabular form; what each of these allocations were for; and if he will make a statement on the matter. [43503/25]

Photo of Ruairí Ó MurchúRuairí Ó Murchú (Louth, Sinn Fein)
Link to this: Individually | In context | Oireachtas source

827. To ask the Minister for Public Expenditure and Reform if he will provide an update on the scheme viability review for flood relief schemes for Annagassan and Termonfeckin; when a decision will be made by the OPW; and if he will make a statement on the matter. [43504/25]

Photo of Ruairí Ó MurchúRuairí Ó Murchú (Louth, Sinn Fein)
Link to this: Individually | In context | Oireachtas source

830. To ask the Minister for Public Expenditure and Reform for an update on CFRAM in County Louth; and if he will make a statement on the matter. [43507/25]

Photo of Kevin MoranKevin Moran (Longford-Westmeath, Independent)
Link to this: Individually | In context | Oireachtas source

I propose to take Questions Nos. 826, 827 and 830 together.

In 2019, the Bellurgan Flood Relief Scheme was completed and is protecting 35 properties from significant flood risk.

Through the agreed delivery model, and with Office of Public Works, (OPW), funding for six staff, Louth County Council is leading the delivery of five flood relief schemes at Dundalk/Blackrock South, Drogheda, Carlingford/ Greenore, Baltray and Ardee, from the €1.3bn investment in flood relief measures under the National Development Plan.

The Dundalk/Blackrock South scheme is to protect 1,880 properties. Engineering and environmental consultants were appointed in 2020. The design options for this scheme are expected to be presented to the public in Q4, 2025 and a preferred option presented in mid-2026. The planning application is expected to be submitted in Q2, 2027.

The combined Drogheda and Baltray Scheme is to protect 425 properties. Engineering and environmental consultants were appointed in September, 2021. The scope of the area for the scheme has recently been extended and Louth County Council is working with its consultants to scope the additional analysis and assessments required and to inform the programme for the scheme.

Funding of €339,480 for a viable option, identified by Louth County Council, for Ardee to protect some 30 properties, has recently been approved by the OPW.

Louth County Council and the OPW are reviewing requirements for a brief to procure engineering and environmental consultants for the Carlingford and Greenore Scheme. The Council will make an application to the OPW for funding for any viable options that provide interim mitigation measures that may improve the conveyance characteristics of the Carlingford drainage system.

The Scheme Viability Reviews (SVRs) for Annagassan and Termonfeckin have been completed. As the SVRs for these areas concluded that potentially viable Flood Relief Schemes have been identified, these areas will continue to be designated as Areas of Potential Significant Flood Risk and Flood Relief Projects are to be brought forward in due course, through the second tranche of schemes. The OPW will discuss with Louth County Council the optimal means for progressing Flood Relief in these areas.

Since 2009, funding of some €1.9 million has been approved for Louth County Council under the OPW’s Minor Flood Mitigation Works and Coastal Protection Scheme, for 26 projects.

Total OPW funding approved for Louth County Council under this scheme for the years 2013 to 2025 is some €1.5m as follows:

Location Project Details Year of Approval Approved Funding €
Ballagan The replacement of sections of and repairs to locations along the Sea Wall found along the Local Secondary Road, LS-7066-0, along the shoreline of Dundalk Bay, for approx. 230m. 2023 100,472
Bellurgan The laying of suitably sized rock armour along shoreline over a distance of 75m. Max. Height of proposed rock armour approximately 2m above shore level. Top level of rock armour to match existing finished road level. 2023 135,000
Drummullagh, Omeath The strengthening of existing boundary wall foundations with mass concrete slab and installation of rock armour over a length of 35m. 2022 62,100
Seabank Castlebellingham Rock armour protection to 20m of unstable cliff face, rock armour to be approx. 2m high 2020 24,750
Salterstown Annagasson Rock armour protection to 60-100m of unstable cliff face, rock armour to be approx. 2m high 2020 24,750
Salterstown Annagassan Rock armour protection to 60-100m of unstable cliff face, rock armour to be approx. 2m high 2019 90,000
Seabank Castlebellingham Rock armour protection to 20m of unstable cliff face, rock armour to be approx. 2m high 2019 29,700
Townparks Dundalk Extend an existing 1350mm diameter drainage pipe towards Balmer’s Bog & associated works 2019 668,571
Dunleer Flood Risk Management Study 2018 22,500
Rampark Lordship Construction of rock armour revetment for 65m 2016 14,400
Baltray To repair the sea defence, including: realignment and raising of a 21m section of the existing promenade wall re-point & fill low level voids on seaward side to prevent further water ingress structural analysis of wall. 2016 54,000
Bellurgan To facilitate the transport of and stockpiling of currently available embankment fill material for planned works in 2016 2015 45,000
Dunleer Detailed Flood Study 2015 58,500
Dundalk Bay (Greenore, Dillonstown & Blackrock) Coastal Erosion Risk Management Study 2015 81,000
Bellurgan Dundalk Placing of rock armour along embankment 2015 9,000
Annagassan Construction of rock armour revetment 2015 10,800
Seabank Castlebellingham Repair the sea defence 2015 13,500
Whitestown Repair the revetment & associated works 2013 7,200
Carlingford Promenade Sea Wall Repair the revetment & associated works 2013 9,990
Annagassan To construct rock armour revetment 2013 10,800
Ballagan Greenore Repair the Sea Armour 2013 18,000
Blackrock Sea Wall Repair the revetment & associated works 2013 27,000
Total 1,517,033