Department of Education and Skills
Schools Building Projects
Duncan Smith (Dublin Fingal East, Labour)
Link to this: Individually | In context | Oireachtas source
311. To ask the Minister for Education and Skills the status of the proposed secondary school in a location (details supplied); when she expects construction to commence; and if she will make a statement on the matter. [4650/25]
Helen McEntee (Meath East, Fine Gael)
Link to this: Individually | In context | Oireachtas source
I wish to advise the Deputy that requirement for school places is kept under on-going review in the context of available information on population, enrolments and residential development activity.
In order to plan for school provision and analyse the relevant demographic data, my department divides the country into 314 school planning areas and uses a geographical information system, using data from a range of sources, including CSO census data, child benefit and school enrolment data, to identify where the pressure for school places across the country will arise and where additional school accommodation is needed at primary and post-primary level.
Major new residential developments have the potential to alter the demand for school places at a local level. In that regard, as part of the demographic demand analysis, my department monitors planning and construction activity in the residential sector. This involves the analysis of data sources from local authorities and the CSO along with the engagement with local authorities and the construction sector. In this way, up-to-date information on significant new residential developments is obtained and factored into the demographic analysis exercise. This is necessary to ensure that schools infrastructure planning is keeping pace with demographic changes, at a local level, where there is a constantly evolving picture with planned new residential development.
Where demographic data indicates that additional provision is required, the delivery of such additional provision is dependent on the particular circumstances of each case and may be provided through:
• Utilising existing unused capacity within a school or schools,
• Extending the capacity of a school or schools,
• Provision of a new school or schools.
If additional accommodation is required, the aim to try and facilitate this, as much as possible, by way of expansion of existing schools rather than establishing new schools. The expansion of existing schools is consistent with wider Government objectives under Project Ireland 2040 for an increased emphasis on compact growth. In respect of post primary schools, new post primary schools must have a student enrolment capacity of 600-1,000 students and must be co-educational. A lower threshold of 400 students may apply to gaelcholáistí, having regard to the alternative of establishing an Irish-medium unit (aonad) in an English-medium school.
New schools are only established in areas of demographic growth as the resources available for school infrastructure have to be prioritised to meet the needs of areas of significant population increase so as to ensure that every child has a school place.
My department is aware of the high level of planned residential development in the Donabate area. The delivery of theses houses and the associated impact in the demand for school places are being closely monitored.
Land at Ballymastone, Donabate have been designated for the future development of school facilities to serve the Donabate area. The requirement to develop a new post primary school has not been identified. Therefore, there is no school building project at this time.
As part of planning for September 2025, my department will be engaging with an increased number of post-primary schools across areas of potential enrolment pressure, including areas in counties Kildare, Wicklow, Dublin, Galway and Cork. This engagement will include the request for admissions data to help identify duplicate applications and determine the need for additional places, if any, in the area. It is expected that, as in previous years, the data sharing will provide confidence that there is sufficient school place availability in the majority of areas. However, if a shortfall of places is identified in an area, the department will work with schools to put the necessary solutions in place.
In addition, my department has improved the central Post-Primary On-line Database IT system that schools use to register student enrolments. This is an important improvement and is available to assist schools to manage the enrolment process and provide real-time notification to schools where a new student has accepted a school place in more than one school. This will help identify duplicate enrolments at a very early stage.
My department has also written to all parents and guardians of children in sixth class with advice and guidance regarding the admissions process for post-primary for the 2025/26 school year. This letter advised parents to apply to multiple schools in areas where there is high demand and requested parents to take steps to avoid holding multiple places.
My department will continue to liaise with local authorities in respect of their county development plan and any associated local area plans with a view to identifying any potential long-term school accommodation requirements across school planning areas.
Duncan Smith (Dublin Fingal East, Labour)
Link to this: Individually | In context | Oireachtas source
312. To ask the Minister for Education and Skills the status of the proposed primary school at a location (details supplied); if the site has been acquired by her Department; when the construction of this much-needed school will commence; if, given that 2,100 housing units have been granted planning permission with 1,700 under construction currently, this can be expedited; and if she will make a statement on the matter. [4651/25]
Helen McEntee (Meath East, Fine Gael)
Link to this: Individually | In context | Oireachtas source
Since 2020, my department has invested over €5.7 billion in our schools throughout the country, involving the completion of over 1,150 school building projects and with construction currently underway at approximately 300 other projects, which includes new school buildings some of which are being delivered in phases. These 300 projects currently at construction involve a total State investment of over €1.3bn.
Between projects currently under construction and projects moving to construction in this latest phase, investments by the Department of Education are adding over 550,000 square metres of new and modernised capacity to our school estate.
This is a record level of investment in school buildings. It will expand the number of school places, significantly increase provision for special education and upgrade and modernise our school infrastructure. The impact of this will be felt in communities right around the country.
The school building project referred to by the Deputy is a campus project which will provide a new 16 classroom primary school and accommodation, including 4 classrooms, for children with special educational needs and a new 8 classroom primary school and accommodation, including 2 classrooms, for children with special educational needs.
The Department has reached an agreement in principle, subject to contract, for the acquisition of the site to which the Deputy refers.
It is intended that the project will be delivered under my Department's ADAPT Programme which uses a professional external Project Manager to co-ordinate and drive the Integrated Project Team to achieve the best possible timeframe for the project through the stages of Architectural Planning, to Tender and Construction.
The ADAPT 4 Programme will be led by Integrated Project Teams (IPT’s), consisting of highly skilled and experienced design professionals, architects, engineers, project managers, quantity surveyors and various other consultants to deliver the projects. AECOM as the Programme Manager are overseeing the procurement and appointment of the IPT’s. It is anticipated that the IPT's for the tranche of projects including the project referred to by the Deputy will be appointed later this year.
It is not possible to provide a timeframe for the progression of the project to tender and construction stages until such time as the necessary statutory approvals have been secured.
My Department will keep the schools and patron body informed of the progression of this educational campus and will liaise in relation to interim accommodation pending delivery of the permanent accommodation for the school.