Written answers
Wednesday, 5 February 2025
Department of Foreign Affairs and Trade
Diplomatic Representation
Paul Donnelly (Dublin West, Sinn Fein)
Link to this: Individually | In context | Oireachtas source
34. To ask the Minister for Foreign Affairs and Trade the nature of refurbishments that were carried out at Irish embassies during 2024; and the nature of refurbishments that are scheduled to be carried out at Irish embassies during 2025, in tabular form. [2882/25]
Simon Harris (Wicklow, Fine Gael)
Link to this: Individually | In context | Oireachtas source
The high level ambition of the DFA Property Strategy (2022-2025) is ‘a network of high quality, safe, secure, sustainable workplaces to double Ireland’s global impact and influence to 2025 and beyond’.
During 2024, the following refurbishment works were carried out in Embassies:
Mission | Nature of the Works |
---|---|
Ankara | New carpets and repainting of Chancery Meeting Room. |
Cairo | Refurbishment of Embassy |
Lilongwe | Repainting of the Chancery |
Oslo | Repainting of the Chancery |
Paris | Refurbishment of Flooring at Chancery |
Valetta | Repainting of the Chancery |
Brussels | Refurbishment of office space |
In respect of 2025, at present the following refurbishments are planned:
Mission | Nature of the Works |
---|---|
Brussels | Refurbishment of Conference Room |
Bogotá | Refurbishment of Chancery |
Vienna | Refurbishment of Chancery |
No comments