161. To ask the Minister for Education and Skills for an update on the ownership of the field adjacent to a school (details supplied); the timings for the extension and remediation works for the school; and if she will make a statement on the matter. [38398/24]

Photo of Norma FoleyNorma Foley (Kerry, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

The major building project for the school referred to by the Deputy will be delivered under my Department's ADAPT Programme.

The ADAPT Programme uses a professional external Project Manager to co-ordinate and drive the Design Team to achieve the best possible timeframe for the project through the stages of Architectural Planning to Tender and Construction.

The Brief for this project is the development of a 32 Classroom Primary School with 4 classrooms for pupils with Special Educational Needs including Pyrite Remediation, the Refurbishment of Existing Buildings and the construction of a New Build Extension and all associated site works, including associated play areas.

The major building project is currently at an early stage of architectural planning - Stage 1 - Preliminary Design, where the design team assess the site and current buildings, and prepare their initial sketch schemes.

A preferred design option, including the scope and extent of works to be carried out will be established during this early stage, to be then further detailed and developed and fully cost-planned, before seeking statutory approvals, including planning permission.

Until the project design is at a stage where statutory approvals, planning permission, etc are secured by the Design Team, it will not be possible to provide an estimated onsite date.

Regarding lands adjacent to the school, a sale of a 4,675m² site adjoining the school to the Department was closed in January 2023, and the Department's application for registration has been lodged with Tailte Éireann.