Written answers
Wednesday, 20 September 2023
Department of Housing, Planning, and Local Government
Housing Provision
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
538. To ask the Minister for Housing, Planning, and Local Government if the 24 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40481/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
539. To ask the Minister for Housing, Planning, and Local Government if the 14 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40482/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
540. To ask the Minister for Housing, Planning, and Local Government if the ten local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40483/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
541. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40484/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
542. To ask the Minister for Housing, Planning, and Local Government if the six AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40485/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
543. To ask the Minister for Housing, Planning, and Local Government if the four local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40486/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
544. To ask the Minister for Housing, Planning, and Local Government if the two local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40487/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
545. To ask the Minister for Housing, Planning, and Local Government if the four local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40488/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
546. To ask the Minister for Housing, Planning, and Local Government if the 30 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40489/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
547. To ask the Minister for Housing, Planning, and Local Government if the 30 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40490/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
548. To ask the Minister for Housing, Planning, and Local Government if the 21 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40491/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
549. To ask the Minister for Housing, Planning, and Local Government if the 18 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40492/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
550. To ask the Minister for Housing, Planning, and Local Government if the 17 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40493/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
551. To ask the Minister for Housing, Planning, and Local Government if the 16 AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40494/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
552. To ask the Minister for Housing, Planning, and Local Government if the six AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40495/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
553. To ask the Minister for Housing, Planning, and Local Government if the four AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40496/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
554. To ask the Minister for Housing, Planning, and Local Government if the ten AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40497/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
555. To ask the Minister for Housing, Planning, and Local Government if the eight AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40498/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
556. To ask the Minister for Housing, Planning, and Local Government if the four AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40499/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
557. To ask the Minister for Housing, Planning, and Local Government if the ten AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40500/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
558. To ask the Minister for Housing, Planning, and Local Government if the 32 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40501/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
559. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40502/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
561. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40504/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
562. To ask the Minister for Housing, Planning, and Local Government if the six local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40505/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
563. To ask the Minister for Housing, Planning, and Local Government if the four local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40506/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
564. To ask the Minister for Housing, Planning, and Local Government if the four local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40507/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
565. To ask the Minister for Housing, Planning, and Local Government if the two local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40508/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
566. To ask the Minister for Housing, Planning, and Local Government if the two local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40509/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
567. To ask the Minister for Housing, Planning, and Local Government if the 39 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40510/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
568. To ask the Minister for Housing, Planning, and Local Government if the 30 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40511/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
569. To ask the Minister for Housing, Planning, and Local Government if the 14 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40512/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
570. To ask the Minister for Housing, Planning, and Local Government if the 42 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40513/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
571. To ask the Minister for Housing, Planning, and Local Government if the 30 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40514/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
572. To ask the Minister for Housing, Planning, and Local Government if the 20 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40515/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
573. To ask the Minister for Housing, Planning, and Local Government if the 48 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40516/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
574. To ask the Minister for Housing, Planning, and Local Government if the 45 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40517/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
575. To ask the Minister for Housing, Planning, and Local Government if the nine AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40518/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
579. To ask the Minister for Housing, Planning, and Local Government if the five AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40522/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
580. To ask the Minister for Housing, Planning, and Local Government if the purchase by local authorities of 28 turnkey housing units in a location (details supplied) was proceeded with; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40523/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
581. To ask the Minister for Housing, Planning, and Local Government if the purchase by local authorities of 61 turnkey housing units in a location (details supplied) was proceeded with; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40524/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
582. To ask the Minister for Housing, Planning, and Local Government if the purchase by local authorities of 26 turnkey housing units in a location (details supplied) was proceeded with; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40525/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
583. To ask the Minister for Housing, Planning, and Local Government if the purchase by local authorities of 34 turnkey housing units in a location (details supplied) was proceeded with; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40526/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
584. To ask the Minister for Housing, Planning, and Local Government if the 19 AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40527/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
585. To ask the Minister for Housing, Planning, and Local Government if the 12 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40528/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
586. To ask the Minister for Housing, Planning, and Local Government if the 12 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40529/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
587. To ask the Minister for Housing, Planning, and Local Government if the 12 single rural local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40530/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
588. To ask the Minister for Housing, Planning, and Local Government if the four local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40531/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
589. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40532/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
590. To ask the Minister for Housing, Planning, and Local Government if the nine local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40533/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
591. To ask the Minister for Housing, Planning, and Local Government if the ten local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40534/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
592. To ask the Minister for Housing, Planning, and Local Government if the ten local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40535/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
593. To ask the Minister for Housing, Planning, and Local Government if the four local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40536/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
594. To ask the Minister for Housing, Planning, and Local Government if the 22 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40537/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
595. To ask the Minister for Housing, Planning, and Local Government if the 20 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40538/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
596. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40539/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
597. To ask the Minister for Housing, Planning, and Local Government if the six AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40540/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
598. To ask the Minister for Housing, Planning, and Local Government if the two local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40541/23]
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
599. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40542/23]
Darragh O'Brien (Dublin Fingal, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
I propose to take Questions Nos. 538, 539, 540, 541, 542, 543, 544, 545, 546, 547, 548, 549, 550, 551, 552, 553, 554, 555, 556, 557, 558, 559, 560, 561, 562, 563, 564, 565, 566, 567, 568, 569, 570, 571, 572, 573, 574, 575, 579, 580, 581, 582, 583, 584, 585, 586, 587, 588, 589, 590, 591, 592, 593, 594, 595, 596, 597, 598 and 599 together.
The relevant details are being compiled and will be provided to the Deputy in accordance with Standing Orders.
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
576. To ask the Minister for Housing, Planning, and Local Government if the seven local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. []
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
577. To ask the Minister for Housing, Planning, and Local Government if the four AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. []
Duncan Smith (Dublin Fingal, Labour)
Link to this: Individually | In context | Oireachtas source
578. To ask the Minister for Housing, Planning, and Local Government if the three AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. []
Darragh O'Brien (Dublin Fingal, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
Awaiting reply from Department.
No comments