Written answers
Wednesday, 20 September 2023
Department of Housing, Planning, and Local Government
Housing Provision
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
440. To ask the Minister for Housing, Planning, and Local Government if the 33 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39900/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
441. To ask the Minister for Housing, Planning, and Local Government if the six AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39901/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
442. To ask the Minister for Housing, Planning, and Local Government if the two AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39902/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
443. To ask the Minister for Housing, Planning, and Local Government if the 18 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39903/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
444. To ask the Minister for Housing, Planning, and Local Government if the 33 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39904/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
445. To ask the Minister for Housing, Planning, and Local Government if the 16 AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39905/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
446. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39906/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
447. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39907/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
448. To ask the Minister for Housing, Planning, and Local Government if the eight AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39908/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
449. To ask the Minister for Housing, Planning, and Local Government if the 24 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39909/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
450. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39910/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
451. To ask the Minister for Housing, Planning, and Local Government if the six local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39911/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
452. To ask the Minister for Housing, Planning, and Local Government if the six local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39912/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
453. To ask the Minister for Housing, Planning, and Local Government if the four local authority housing units approved for construction in a location a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39913/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
454. To ask the Minister for Housing, Planning, and Local Government if the ten AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39914/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
455. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39915/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
456. To ask the Minister for Housing, Planning, and Local Government if the 20 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39916/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
457. To ask the Minister for Housing, Planning, and Local Government if the 14 AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39917/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
458. To ask the Minister for Housing, Planning, and Local Government if the 14 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39918/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
459. To ask the Minister for Housing, Planning, and Local Government if the six AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39919/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
460. To ask the Minister for Housing, Planning, and Local Government if the four AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39920/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
461. To ask the Minister for Housing, Planning, and Local Government if the 55 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39921/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
462. To ask the Minister for Housing, Planning, and Local Government if the 25 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39922/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
463. To ask the Minister for Housing, Planning, and Local Government if the 12 AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39923/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
464. To ask the Minister for Housing, Planning, and Local Government if the ten local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39924/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
465. To ask the Minister for Housing, Planning, and Local Government if the ten local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39925/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
466. To ask the Minister for Housing, Planning, and Local Government if the six single rural local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39926/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
467. To ask the Minister for Housing, Planning, and Local Government if the five AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39927/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
468. To ask the Minister for Housing, Planning, and Local Government if the three local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39928/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
469. To ask the Minister for Housing, Planning, and Local Government if the 66 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39929/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
470. To ask the Minister for Housing, Planning, and Local Government if the 40 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39930/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
471. To ask the Minister for Housing, Planning, and Local Government if the 30 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39931/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
472. To ask the Minister for Housing, Planning, and Local Government if the 21 AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39932/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
473. To ask the Minister for Housing, Planning, and Local Government if the 21 AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39933/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
474. To ask the Minister for Housing, Planning, and Local Government if the 20 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39934/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
475. To ask the Minister for Housing, Planning, and Local Government if the 20 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39935/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
476. To ask the Minister for Housing, Planning, and Local Government if the 11 AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39936/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
477. To ask the Minister for Housing, Planning, and Local Government if the four AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39937/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
478. To ask the Minister for Housing, Planning, and Local Government if the 12 AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39938/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
479. To ask the Minister for Housing, Planning, and Local Government if the ten local authority housing units approved for construction a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39939/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
480. To ask the Minister for Housing, Planning, and Local Government if the 29 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39940/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
481. To ask the Minister for Housing, Planning, and Local Government if the 18 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39941/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
482. To ask the Minister for Housing, Planning, and Local Government if the ten local authority housing units approved for construction a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39942/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
483. To ask the Minister for Housing, Planning, and Local Government if the four AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39943/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
484. To ask the Minister for Housing, Planning, and Local Government if the 50 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39944/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
485. To ask the Minister for Housing, Planning, and Local Government if the 30 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39945/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
486. To ask the Minister for Housing, Planning, and Local Government if the 14 AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39946/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
487. To ask the Minister for Housing, Planning, and Local Government if the two AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39947/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
488. To ask the Minister for Housing, Planning, and Local Government if the four AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39948/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
489. To ask the Minister for Housing, Planning, and Local Government if the 13 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39949/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
490. To ask the Minister for Housing, Planning, and Local Government if the three local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39950/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
491. To ask the Minister for Housing, Planning, and Local Government if the 20 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39951/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
492. To ask the Minister for Housing, Planning, and Local Government if the local authority housing unit approved for construction in a location (details supplied) has finished construction; if so, its completion date and the Minister by which it was opened; and if not, the reasons for the project not proceeding. [39952/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
493. To ask the Minister for Housing, Planning, and Local Government if the 28 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39953/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
494. To ask the Minister for Housing, Planning, and Local Government if the 20 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39954/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
495. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39955/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
496. To ask the Minister for Housing, Planning, and Local Government if the 28 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39956/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
497. To ask the Minister for Housing, Planning, and Local Government if the nine AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39957/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
498. To ask the Minister for Housing, Planning, and Local Government if the local authority housing unit approved for construction in a location (details supplied) has finished construction; if so, the completion date; the total cost of the project, if the development was officially opened by a Minister and when that happened; and if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39958/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
499. To ask the Minister for Housing, Planning, and Local Government if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39959/23]
Ivana Bacik (Dublin Bay South, Labour)
Link to this: Individually | In context | Oireachtas source
500. To ask the Minister for Housing, Planning, and Local Government if the 28 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [39960/23]
Darragh O'Brien (Dublin Fingal, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
I propose to take Questions Nos. 440, 441, 442, 443, 444, 445, 446, 447, 448, 449, 450, 451, 452, 453, 454, 455, 456, 457, 458, 459, 460, 461, 462, 463, 464, 465, 466, 467, 468, 469, 470, 471, 472, 473, 474, 475, 476, 477, 478, 479, 480, 481, 482, 483, 484, 485, 486, 487, 488, 489, 490, 491, 492, 493, 494, 495, 496, 497, 498, 499 and 500 together.
The relevant details are being compiled and will be provided to the Deputy in accordance with Standing Orders.
No comments