323. To ask the Minister for Public Expenditure and Reform the refurbishment works that the OPW plans to carry out at Garda stations within the DMR over the next six months; the nature of these works; and when these projects will commence in tabular form. [55514/22]

Photo of Patrick O'DonovanPatrick O'Donovan (Limerick County, Fine Gael)
Link to this: Individually | In context | Oireachtas source

I can confirm that the Office of Public Works has a number of scheduled refurbishment works to Garda Stations within the DMR to be carried out over the next six months. The Garda Stations and the nature of the works to be carried out are outlined in the table below and include works valued in excess of €100,000 which are funded either by the OPW or Garda Estate Management.

The Commencement dates for the scheduled works are subject to the final sign off of operational and design requirements by An Garda Síochána and where necessary, a successful tendering process.

Garda Station Nature of the works Works Due for Commencement
Bray Garda Station Atrium Roof Replacement Q2/3-2023
Cabinteely Garda Station Painting, including repairs to plaster Agreed to be carried out in phases over the next year
Cabinteely Garda Station Showers on Ground Floor On Site
Crumlin Garda Station Repurpose Radio Workshops Work to commence Q4-2022
Dun Laoghaire Garda Station UA Works to Public Area and Ancillary Works On Site
Ronanstown Garda Station New Changing Facilities On Site
Enniskerry Garda Station Fabric Upgrade Works On Site
Kevin Street Garda Station Glazing Replacement Q2-2023
Kilmainham Garda Station Fabric Upgrade Works the “The Stables” building Q2-2023
Pearse Street Garda Station Roof Works On Site
Cabra Garda Station Refurb/Reconfigure Portacabins Q2/Q3 2023 tbc
Coolock Garda Station Conversion of Container to Storage Q3-2023 tbc
Coolock Garda Station Refurb Existing External Outhouses Q3-2023 tbc
Finglas Garda Station Repair of Tower Glass Façade Q3 2023
13 A O’Connell Street Refurbishment and Fitout Works On Site
Malahide Garda Station Attic Maintenance and Repairs to Roof Q2 2023
Garristown Garda Station Driveway Resurface and possible Accessibility Works Q1/Q2 2023
Swords Garda Station Canteen Refurbishment Q1/Q2 2023