Written answers

Tuesday, 8 November 2022

Department of Communications, Climate Action and Environment

National Broadband Plan

Photo of John LahartJohn Lahart (Dublin South West, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

133. To ask the Minister for Communications, Climate Action and Environment if he will provide an update on Broadband roll-out in an area of DSW, with particular reference to the rural mountains and valleys. [55244/22]

Photo of Ossian SmythOssian Smyth (Dún Laoghaire, Green Party)
Link to this: Individually | In context | Oireachtas source

The High Speed Broadband Map, which is available at www.broadband.gov.ie, shows the areas which will be included in the National Broadband Plan (NBP) State led intervention as well as areas targeted by commercial operators. The map is colour coded and searchable by address and Eircode. Premises in the AMBER area will be provided with high speed broadband through the State led Intervention delivered by National Broadband Ireland (NBI). The BLUE area represents those areas where commercial providers are either currently delivering or have plans to deliver high speed broadband services. There are 61,887 premises in the Dublin South-West constituency of which 819 premises are in the AMBER area and 61,068 premises are within the BLUE area and will be provided with high speed fibre broadband under the NBP.

I am advised by National Broadband Ireland (NBI) that, as of 28 October 2022, over 97,000 premises can order or pre-order a high-speed broadband connection across 25 counties, with over 87,700 premises passed across 25 counties and available for immediate connection. Construction is underway across 26 counties demonstrating that the project is reaching scale. To date, the level of connections is increasing on a daily basis and is in line with or exceeding projections. NBI has advised that 1,858 premises in County Dublin are passed with a high-speed fibre broadband network and available for immediate connection.

The network rollout for the NBP is divided into 227 Deployment Areas (DAs) across the country. These are typically an area of approximately 25km in radius and in total they cover 96% of Ireland’s landmass. The architecture of the network design is specifically based on the design of the NBI network coming from the eir exchanges or the metropolitan area networks (MANs). It is based on an engineering design that allows NBI to reach every premises as quickly as possible working within the confines of how fibre networks are built. Villages/Townlands/Counties can be covered by a number of DAs which means there are differing timescales for the rollout across county areas.

NBI has made recent improvements to their website to enhance the provision of information to Oireachtas members. NBI has now completed a suite of changes, creating a portal that will serve as a means for Oireachtas members to proactively search for information relevant to their county/local area. The portal provides an up-to-date picture of NBI’s deployment schedule across the 227 Deployment Areas (DAs) in all 26 counties. A particular county can be selected to view an update of the overall number of premises in the Intervention Area, the overall NBP investment in the county, the number of premises passed and connected to date and the status of each of the Deployment Areas with the anticipated date for connection over the lifetime of the project. The dedicated webpage can be accessed here: www.nbi.ie.

Comments

No comments

Log in or join to post a public comment.