Schools Building Projects

Photo of Seán SherlockSeán Sherlock (Cork East, Labour)
Link to this: Individually | In context | Oireachtas source

276. To ask the Minister for Education and Skills the start date of construction works for a project (details supplied); and the expected timeline of construction. [17236/22]

Photo of Norma FoleyNorma Foley (Kerry, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

The Letter of Intent (LOI) issued on 15th February 2022 to the preferred tenderer. This allows the preferred bidder to put in place the Bond, Insurances and confirmations of all legal arrangements required under the Contract.

Following receipt of all the necessary documentation, the Department will be in a position to issue the Letter of Acceptance (LOA), which will allow the contractor to mobilise on site. It is expected that the LOA will issue very shortly after receipt of all the necessary documentation.

Photo of Seán SherlockSeán Sherlock (Cork East, Labour)
Link to this: Individually | In context | Oireachtas source

277. To ask the Minister for Education and Skills the start date of construction works for a project (details supplied); and the expected timeline of construction. [17237/22]

Photo of Norma FoleyNorma Foley (Kerry, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

The Letter of Intent (LOI) issued on 15th February 2022 to the preferred tenderer. This allows the preferred bidder to put in place the Bond, Insurances and confirmations of all legal arrangements required under the Contract.

Following receipt of all the necessary documentation, the Department will be in a position to issue the Letter of Acceptance (LOA), which will allow the contractor to mobilise on site. It is expected that the LOA will issue very shortly after receipt of all the necessary documentation.