Written answers

Tuesday, 1 February 2022

Department of Housing, Planning, and Local Government

Defective Building Materials

Photo of Eoin Ó BroinEoin Ó Broin (Dublin Mid West, Sinn Fein)
Link to this: Individually | In context | Oireachtas source

333. To ask the Minister for Housing, Planning, and Local Government the timeline for the revised defective block redress scheme; when the legislation will be published; and when the new scheme will be open to applications. [4405/22]

Photo of Darragh O'BrienDarragh O'Brien (Dublin Fingal, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

I brought a Memorandum to Government on an enhanced Defective Concrete Blocks Grant Scheme on 30 November 2021 and it included an unprecedented suite of improvements to the current scheme. Government approved the enhanced scheme which it is estimated will cost approximately €2.2Bn. The comprehensive changes include:

- The current 90% maximum grant will be increased to a 100% grant for all remediation options 1-5.

- The maximum grant cap for option 1 (demolition and rebuild) will be increased from €247,500 to €420,000.

- The grant calculation methodology in respect of option 1 remediation will be based on a cost per square foot  with costings to be set by my  Department in consultation with the Society of Chartered Surveyors Ireland (SCSI). An indicative rate of €145 per square foot for the first 1,000 sq foot with a sliding scale thereafter has been announced by my Department and this will be subject to review as required in line with construction cost changes. In the case of remediation options 2-5 a similar but necessarily different approach will be taken to inform the appropriate rate for blockwork removal and replacement following consultation with SCSI.

- A revised application process will be introduced which will only require the homeowner to submit an initial ‘Building Condition Assessment’ at minimal cost recoupable on entry to the Scheme. The Housing Agency will take over testing, sampling and categorisation of homes on behalf of homeowners and local authorities and will thereafter recommend the appropriate remediation option and grant amount for each home. 

- Alternative accommodation and storage costs are to be included, subject to a maximum of €20,000.

- €5,000 will be available for essential immediate repair works recommended by a building professional as part of the Building Condition Assessment process.

- In relation to works carried out under remediation options 2-5, a second grant option, will be available for such a home in the future if blockwork which was not removed as part of the initial remediation work subsequently proves defective in accordance with the IS:465 standard. - A new independent appeals process will be introduced.

- The Scheme will be extended beyond the current scope of Principal Private Residences only, to also cover Residential Tenancies Board registered rental properties, subject to the introduction of a clawback mechanism upon re-sale within a set time period depending on the remediation option used. Opportunities for the State to acquire such rental properties for social housing purposes will also be examined.

Full details in relation to the changes announced are available at the following link;

www.gov.ie/en/press-release/e365e-minister-obrien-announces-enhancements-to-the-defective-concrete-block-scheme/

I aim to bring the required primary legislation to give effect to the enhanced scheme before the Oireachtas as soon as possible with Spring 2022 being the indicative target timeline.

In the immediate term I am making amendments to the Dwellings Damaged by the Use of Defective Concrete Blocks in Construction (Remediation) (Financial Assistance) Regulations 2020 which will allow for the recoupment of Engineer fees to homeowners who have applied for entry into the scheme. Furthermore, as part of these amended regulations, €5,000 will be recoupable as an allowable cost under the scheme for essential immediate repair works which are deemed necessary by a homeowners engineer under a Building Condition Assessment report.

Comments

No comments

Log in or join to post a public comment.