Written answers

Wednesday, 21 April 2021

Department of Health

Hospital Waiting Lists

Photo of Peadar TóibínPeadar Tóibín (Meath West, Aontú)
Link to this: Individually | In context | Oireachtas source

1509. To ask the Minister for Health the number of persons awaiting treatment for scoliosis in each county. [18103/21]

Photo of Stephen DonnellyStephen Donnelly (Wicklow, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

I sincerely regret that children can experience a long waiting time for treatment for scoliosis, and I am conscious of the burden that this places on them and their families. This Government’s priority is to improve waiting times for all patients accessing hospital treatment across all specialties, including Scoliosis.

It is recognised that waiting times for scheduled appointments and procedures have been impacted as a direct result of the COVID-19 pandemic, and as a result of the deferral of elective scheduled care activity in March, April and May of 2020, and since 2nd January 2021.

It is of note that key social distancing measures and Infection Prevention and Control requirements, such as two-metre distancing, have a material impact on the available physical space to deliver all hospital services, including scoliosis procedures, and this has had a significant impact on both available capacity and operational activity levels.

Despite the challenges resulting from the Covid-19 pandemic last year, by 31st December 2020 Children’s Health Ireland (CHI) had carried out 322 scoliosis procedures, a decrease in activity of 16% compared with 2019. By the end of February 2021, CHI had carried out a total of 108 scoliosis surgeries, an increase of 24 surgeries (29%) compared to the same period in 2020.

Children’s Health Ireland has advised that under the current HSE guidelines, they have reduced the number of procedures to urgent and those that are time sensitive. Children’s Health Ireland has advised that they are working with the National Orthopaedic Hospital Cappagh to expand orthopaedic capacity. This is expected to have a positive impact on orthopaedic long waiting patients, including reductions in waiting times for children with scoliosis. CHI is also running additional orthopaedic clinics in City West, using a new active clinical triage model, which is reducing the number of children waiting the longest for appointments.

Representatives of CHI, the Orthopaedic Spinal Team and the Advocacy Groups continue to meet as part of the Co-Design framework on a quarterly basis to work on providing solutions for patients in the spinal service.

In relation to the specific query raised by the Deputy, the attached table, provided to my Department by the National Treatment Purchase Fund (NTPF) shows the number of patients awaiting scoliosis procedures in all hospitals by County of Residence at the end of March 2021. The NTPF has advised that the waiting list data they receive from hospitals relates to the procedures required by the patients and not to the condition being treated. The waiting list data attached is based on the procedures relevant to scoliosis patients but may also include patients with other conditions.

Photo of Peadar TóibínPeadar Tóibín (Meath West, Aontú)
Link to this: Individually | In context | Oireachtas source

1510. To ask the Minister for Health the number of persons waiting for cataract appointments in each county. [18104/21]

Photo of Stephen DonnellyStephen Donnelly (Wicklow, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

It is recognised that waiting times for scheduled appointments and procedures have been impacted in the last year as a direct result of the COVID-19 pandemic.

The HSE is currently recommending that only critical time dependent elective procedures are undertaken at this time due to the on-going and significant increased demand for bed capacity related to COVID-19.

This decision was made arising from the rapid increase in Covid-19 admissions and to ensure patient safety and that all appropriate resources were made available for Covid-19 related activity and time-critical essential work.

Patient safety remains at the centre of all hospital activity and elective care scheduling. To ensure services are provided in a safe, clinically-aligned and prioritised way, hospitals are following HSE clinical guidelines and protocols. The HSE continues to optimise productivity through alternative work practices such as the use of alternative settings including private hospitals, community facilities and alternative outpatient settings.

On 23 March the HSE published the “Safe Return to Health Services Plan”. This plan outlines a three phased plan for the proposed restoration of services across Community Services, Acute Hospital Operations, Cancer Services and Screening Services. It sets target times for their safe return and details the conditions and challenges that will have to be met.

Every phase of the plan has been informed by clinical guidance and putting patient and staff safety first.

Decisions in relation to the type and volume of activity will be made at site level based on local COVID-19 numbers, available capacity and guidance from national clinical leads.

The schedule outlined in the plan for resumption of services will be regularly monitored by the HSE and updated as appropriate, dependant on public health advice and healthcare capacity.

In recent years, my Department has worked with the HSE and the National Treatment Purchase Fund (NTPF) to improve access for patients waiting for high volume procedures, including cataracts. Ophthalmology services are provided throughout all hospital groups in the country, with cataract removal one of the key procedures carried out as part of this specialty.

A key development in improving access to Ophthalmology services was the opening of a stand-alone high-volume consultant-led cataract theatre by the University of Limerick Hospital Group in Nenagh Hospital in 2018, with the intention that it would facilitate patients from surrounding geographical areas to avail of their treatment there. The impact of such initiatives can be seen in the reduction in the waiting times to access cataract procedures since 2019. At the end of March 2021 there were 4,226 patients waiting for a cataract procedure compared to 6,268 in March 2019.

The work of the HSE to improve access to elective care and reduce waiting times for patients is supported by the National Treatment Purchase Fund (NTPF). This includes increased use of private hospitals, funding weekend and evening work in public hospitals, funding “see and treat” services where minor procedures are provided at the same time as outpatient consultations, funding hybrid services where public and private hospitals contribute to the treatment of patients, virtual clinics and clinical validation.

€240 million has been provided in Budget 2021 for an access to care fund, €210m of which has been allocated to the HSE and a further €30m to the National Treatment Purchase Fund. This will be used to fund additional capacity to address the shortfall arising as a result of measures taken in the context of COVID-19, as well as to address waiting lists.

The data requested by the Deputy regarding the number of persons waiting for cataract appointments in each county is outlined in the attached document.

Comments

No comments

Log in or join to post a public comment.