Written answers

Wednesday, 24 March 2021

Department of Communications, Climate Action and Environment

National Broadband Plan

Photo of Marian HarkinMarian Harkin (Sligo-Leitrim, Independent)
Link to this: Individually | In context | Oireachtas source

213. To ask the Minister for Communications, Climate Action and Environment the timeline for an area (details supplied) in County Leitrim to be connected to broadband as part of the roll-out of the national broadband plan; and if he will make a statement on the matter. [13984/21]

Photo of Eamon RyanEamon Ryan (Dublin Bay South, Green Party)
Link to this: Individually | In context | Oireachtas source

The Question refers to a premises located in the AMBER area on the National Broadband Plan (NBP) High Speed Broadband Map which is available on my Department's website www.broadband.gov.ie. The AMBER area represents the area to be served by the network to be deployed under the NBP State led intervention.

I am advised by National Broadband Ireland that, as of 17 March 2021, nearly 194,000 premises across all counties have been surveyed. Surveys are complete or underway in County Leitrim around Carrick-on Shannon, Tullybeg, Leitrim Village, Mong, Foxborough, Lismannagh, Drumsha, Clogher, Drishoge and Lisnagat. Surveying is the first step towards delivering the new fibre network and involves physically walking the routes and documenting images, notes and measurements of the poles, cables and underground ducts in each area. This informs design solutions for provision of the fibre network to each and every premises in the surveyed area and leads to detailed designs. The detailed designs are then used to initiate the ‘make ready’ project with Open eir for the area, where Open eir ensure any poles and ducts being reused are fit for purpose and the make ready of other required infrastructure. This step also informs decisions on equipment ordering. Survey data is also needed to initiate pre-works which pave the way for the deploying of fibre. Pre-works involve construction of new duct routes, erection of poles, building chambers, and tree trimming. On completion of these pre-works, the main construction works can commence. This involves deploying fibre overhead on poles and in underground ducts, splicing of fibre, and unblocking of ducts. Once the main construction works are completed and the appropriate level of testing has been undertaken, the fibre network can be commissioned and end users can order their connection.

Further details are available on specific areas within County Leitrim through the NBI website which provides a facility for any premises within the intervention area to register their interest in being provided with deployment updates through its website www.nbi.ie. Individuals who register with this facility will receive regular updates on progress by NBI on delivering the network and specific updates related to their own premises as works commence. I am advised that NBI is working to provide more detail on its website, with a rolling update on network build plans. NBI also has a dedicated email address, reps@nbi.ie, which can be used by Oireachtas members for specific queries.

Broadband Connection Points (BCPs) are a key element of the NBP providing high speed broadband in every county in advance of the roll out of the fibre to the home network. As of 17 March, 289 BCP sites have been installed by NBI and the high speed broadband service will be switched on in these locations through service provider contracts managed by the Department of Rural and Community Development for publicly accessible sites and the Department of Education for school BCPs. BCP’s are installed at Gortlettragh Community Centre, Donaghmore Workhouse and Famine Museum, and Glencar Waterfall.  The site at Aghanlish Community Centre is installed and connected. Further details can be found at https://nbi.ie/bcp-locations/. 

Aughawillian National School and Saint Michael's Primary School are connected by NBI for educational access as part of this initiative.  My Department continues to work with the Department of Education to prioritise schools with no high speed broadband, within the Intervention Area, for connection over the term of the NBP. In this regard, an acceleration of this aspect of the National Broadband Plan was announced in December which will see some 679 primary schools connected to high speed broadband by 2022, well ahead of the original target delivery timeframe of 2026. Further details are available on the NBI website at .