474. To ask the Minister for Public Expenditure and Reform the status of all planned and incomplete flood relief and management schemes in County Cork; and if he will make a statement on the matter. [33325/20]

Photo of Patrick O'DonovanPatrick O'Donovan (Limerick County, Fine Gael)
Link to this: Individually | In context | Oireachtas source

The following table gives a list of schemes for County Cork and the status of each scheme.

Name of Scheme Status
Ballinhassig Scheme at prefeasiblity stage
Ballymakeery/Ballyvourney Scheme at design/planning stage
Bandon Construction ongoing but will be substantially complete in 2020.
Bantry Tender documents for engineering consultant being finalised for issue.
Blackpool Scheme has been submitted to the Minister for Public Expenditure and Reform for statutory consent under the Arterial Drainage Acts
Carrigaline Scheme is under review to confirm the technical aspects and viability, and, subject to outcomes, will then progress to Outline Design and Planning.
Clonakilty Construction ongoing
Douglas(incl Togher culvert) Construction ongoing
Glashaboy Scheme has been submitted to the Minister for Public Expenditure and Reform for statutory consent under the Arterial Drainage Acts
Lower Lee (Cork City) Scheme at design stage prior to submission to the Minister for Public Expenditure and Reform for Statutory consent under the Arterial Drainage Acts
Macroom Scheme at pre-feasibility stage
Midleton Scheme at scheme development and preliminary design stage
Skibbereen Substantially complete
Ballingeary Scheme to be developed as part of 10-year NDP 2018-2027)
Castlemartyr Scheme to be developed as part of 10-year NDP 2018-2027)
Castletown Bearhaven Scheme to be developed as part of 10-year NDP 2018-2027)
Inchigeelagh Scheme to be developed as part of 10-year NDP 2018-2027)
Inishannon Scheme to be developed as part of 10-year NDP 2018-2027)
Kanturk Scheme to be developed as part of 10-year NDP 2018-2027)
Rathcormack Scheme to be developed as part of 10-year NDP 2018-2027)
Schull Scheme to be developed as part of 10-year NDP 2018-2027)
Youghal Scheme to be developed as part of 10-year NDP 2018-2027)