Written answers

Tuesday, 9 June 2020

Department of Transport, Tourism and Sport

Road Projects

Photo of Mary ButlerMary Butler (Waterford, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

595. To ask the Minister for Transport, Tourism and Sport the status of the N25 Waterford to Glenmore scheme project; the Exchequer and EU funding allocated to the project; the total project cost; the time frame for each phase envisaged under the project from appraisal, design and construction stage; if funding is being drawn down under the EU TEN-T; and the changes in environmental legislation, design standards and requirements under the Public Spending Code that resulted in new route corridor options being developed for the project. [10430/20]

Photo of Shane RossShane Ross (Dublin Rathdown, Independent)
Link to this: Individually | In context | Oireachtas source

As Minister for Transport, Tourism & Sport, I have responsibility for overall policy and funding in relation to the national roads programme. Once funding arrangements have been put in place with TransportInfrastructure Ireland (TII), under the Roads Acts 1993-2015 the planning, design and construction of individual national roads is a matter for TII in conjunction with the local authorities concerned. TII is, therefore, responsible for the distribution of funds under the Capital Programme for the implementation of the national roads programme in accordance with Project Ireland 2040, within the framework of the National Development Plan (NDP). Consequently, TII is best placed to advise on the current status and funding in respect of this scheme.

Noting the above position, I have referred the question to TII to provide you with the information requested. Please advise my private office if you do not receive a reply within 10 working days.