Written answers

Tuesday, 2 July 2019

Department of Defence

Naval Service Vessels

Photo of Catherine ConnollyCatherine Connolly (Galway West, Independent)
Link to this: Individually | In context | Oireachtas source

138. To ask the Taoiseach and Minister for Defence his plans to replace the LÉ Orla; and if he will make a statement on the matter. [27781/19]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context | Oireachtas source

My priority as Minister with Responsibility for Defence is to ensure that the operational capability of the Army, Air Corps and Naval Service is maintained to the greatest extent possible. This is primarily to enable the Defence Forces to carry out their roles as assigned by Government as set out in the White Paper on Defence. Equipment priorities for the Army, Air Corps and Naval Service are being considered in the context of the lifetime of the White Paper on Defence as part of the capability development and equipment planning process.

In this context the principal aim over the period of the White Paper is to replace and upgrade, as required, existing capabilities in order to retain a flexible response for a wide range of operational requirements at home and overseas. In accordance with the National Development Plan, the capital allocation for Defence has been increased to €106 million for 2019, an increase of €29 million. The Defence Capital envelope for the period 2018-2021 is €416m, and this will enable investment in major equipment platforms, including the continuing replacement and refurbishment of Naval Service Vessels.

The White Paper underpins the ongoing replacement of the Naval Service fleet. A significant investment over recent years has been on the procurement of new Off-Shore Patrol Vessels (OPVs) for the Naval Service. The fourth ship in the programme, LÉ George Bernard Shaw, was commissioned into service in May 2019 reflecting an investment by the Government of over €250 million in the new ships programme since 2010. The four ships are performing well in operational service.

Despite the recent acquisitions to the Naval Service fleet, three ships in the current flotilla are over 30 years old (LÉ Eithne and LÉ Ciara were built in 1984 and LÉ Orla was built in 1985). The White Paper provides for the replacement of the current Naval Service flagship LÉ Eithne with a multi role vessel (MRV) which will be enabled for helicopter operations and will also have a freight carrying capacity. It is the intention to hold a public tender competition in due course to cover the supply of the MRV subject to the availability of funding within the overall Defence capital funding envelope. The cost of the MRV will only be known once the tender competition is concluded.

Future Naval Service capabilities are being planned as part of the White Paper project planning process which will determine the Defence Organisation’s maritime capability requirements.