Written answers

Tuesday, 28 May 2019

Department of Education and Skills

Schools Building Projects Status

Photo of John CurranJohn Curran (Dublin Mid West, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

98. To ask the Minister for Education and Skills the status of an extension for a school (details supplied) in County Dublin; the timeline for the project; and if he will make a statement on the matter. [22536/19]

Photo of Joe McHughJoe McHugh (Donegal, Fine Gael)
Link to this: Individually | In context | Oireachtas source

The major building project for the school referred to by the Deputy is currently at an advanced stage of architectural planning - Stage 2(b) Detailed Design which includes the application for statutory approvals and the preparation of tender documents. All Statutory approvals have been secured.

In the context of reviewing the revised Stage 2(b) report submitted to the Department it was noted that the estimated Stage 2(b) cost plan had increased substantially from the approved costs at Stage 2(a).

In accordance with Department Design Team Procedures, where the approved cost limits have been exceeded, a Brief Change Report is necessary.

The Design Team is currently working on the required Brief Change Report. Upon receipt, review and approval of the Brief Change Report the Design Team will commence work on necessary revisions to the Stage 2(b) submission.

Upon receipt and review of a revised stage 2(b) submission the Department will revert to the Board of Management of the school with regard to the further progression of the project at that time.

Photo of Seán SherlockSeán Sherlock (Cork East, Labour)
Link to this: Individually | In context | Oireachtas source

99. To ask the Minister for Education and Skills when a school building project (details supplied) will commence. [22552/19]

Photo of Joe McHughJoe McHugh (Donegal, Fine Gael)
Link to this: Individually | In context | Oireachtas source

The project referred to by the Deputy is currently in architectural planning. The school will be delivered under the Department's Design & Build Programme. This delivery programme uses a professional external Project Manager to progress the project through the relevant stages of architectural planning, tendering and construction in the shortest possible timeframe.

The design is being progressed in preparation for the planning application which will be the next key step in the progression of the project. It is intended that Planning Permission will be lodged within the second quarter of 2019.