70. To ask the Minister for Public Expenditure and Reform the amount the OPW spent on the refurbishment of Garda stations in the Laois Garda division in 2018 and to date in 2019, in tabular form; and if he will make a statement on the matter. [22315/19]

Photo of Kevin  MoranKevin Moran (Longford-Westmeath, Independent)
Link to this: Individually | In context | Oireachtas source

I can confirm the Office of Public Works have undertaken works relating to refurbishment, renovation or maintenance of facilities in twelve Garda Stations in County Laois in 2018/19. Details are included below and incorporate works funded by both the Office of Public Works and An Garda Síochána.

Garda Station Description of current/planned works. 2018 € 2019 (to 21/05/19) €
Durrow GS General maintenance works, Roof repair 2,845.15 482.38
Mountmellick GS General maintenance works, Install power points, Replacement of doors 9,194.81 1,518.72
Rathdowney GS General maintenance works 644.18 968.03
Stradbally GS General maintenance works, Shower repair, Replace door, Exterior maintenance works 13,136.89 5,764.03
Borris-in-Ossory GS General maintenance works, Refurbishment including Dry lining, Plastering, Wiring, Flooring, Shower/toilet facility 80,324.77 -
Ballylinan GS Asbestos Survey 676.50 -
Portlaoise GS General maintenance works, Emergency lighting, Repair gutter, Repair flat roof, Repairs to plaster, Pot holes. *Preparation for planned refurbishment including Ramp, Removal of raised beds, Temporary accommodation, Tree pruning, M&E Consultancy, Groundworks 55,258.34 158,431.17
Arles GS Asbestos Survey 676.50 -
Mountrath GS General maintenance works, Install data points 1,504.02 124.85
Abbeyleix GS General maintenance works, Asbestos Survey 2,852.52 958.27
Clonaslee GS General maintenance works 830.39 934.97
Portarlington GS General maintenance works, Replace broken lights, Shower repairs, Security gate repairs 14,293.86 996.56
Total182,237.93170,178.98

*Refurbishment of Portlaoise Garda Station is currently at Design Stage. Some preparatory works are underway.