Written answers
Tuesday, 6 November 2018
Department of Transport, Tourism and Sport
Road Projects
Fiona O'Loughlin (Kildare South, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
872. To ask the Minister for Transport, Tourism and Sport the procedure on the M7-N7 for breakdowns while the upgrade work continues; and if there is a maximum length of time a person would wait for the recovery truck to arrive. [44622/18]
Fiona O'Loughlin (Kildare South, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
873. To ask the Minister for Transport, Tourism and Sport the details of the contractors employed to recover broken down vehicles from the M7-N7 while the roadworks are taking place. [44623/18]
Fiona O'Loughlin (Kildare South, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
874. To ask the Minister for Transport, Tourism and Sport if a review of the breakdown procedure on the M7-N7 will be considered in view of the long delays being experienced due to car breakdowns. [44624/18]
Shane Ross (Dublin Rathdown, Independent)
Link to this: Individually | In context | Oireachtas source
I propose to take Questions Nos. 872 to 874, inclusive, together.
As Minister for Transport, Tourism and Sport, I have responsibility for overall policy and funding in relation to the national roads programme. Under the Roads Acts 1993-2015, the planning, design and operation of individual roads is a matter for the relevant road authority in relation to local and regional roads, or for Transport Infrastructure Ireland (TII) in conjunction with the local authorities concerned, in relation to national roads.
Noting the above position, I have referred the questions concerning the issues raised on the M7/N7 route to TII for a more detailed and direct reply. Please advise my private office if you do not receive a reply within 10 working days.
No comments