614. To ask the Minister for Communications, Climate Action and Environment the timeframe for the publication of the studies on the North-South interconnector. [37375/18]

Photo of Denis NaughtenDenis Naughten (Roscommon-Galway, Independent)
Link to this: Individually | In context | Oireachtas source

In 2017 I commissioned two studies designed to address the main points of the motions passed in Dáil and Seanad Éireann as well as key concerns expressed by those opposed to the development of the North South Interconnector as an overhead line. The first is an independent study to examine the technical feasibility and cost of undergrounding the interconnector. The second study is focused on the levels of compensation provided to land and property owners in proximity to high-voltage transmission lines in a European context.

​ Both studies are now completed and have been submitted to me. I intend to bring both reports to Government in the coming weeks and will publish them as soon as possible thereafter.