Schools Refurbishment

Photo of Róisín ShortallRóisín Shortall (Dublin North West, Social Democrats)
Link to this: Individually | In context | Oireachtas source

97. To ask the Minister for Education and Skills the fire safety works required at a school (details supplied) to bring it up to fire safety standards; the status of the work; the completion date for each work item; and if he will make a statement on the matter. [44097/17]

Photo of Richard BrutonRichard Bruton (Dublin Bay North, Fine Gael)
Link to this: Individually | In context | Oireachtas source

The scope of works for the school referred to by the Deputy involves the upgrading of fire-stopping and fire protection, replacement of fire doors and works to the emergency lighting

The fire stopping/protection works have commenced and are due for completion in March 2018.  New fire doors have been ordered and once on site will be fitted over a two week period and outside of school times. Electrical works are to commence this week and are due to be completed within the next 4 to 6 weeks.

The remainder of the works will be completed as soon as possible.