Written answers
Tuesday, 7 March 2017
Department of Education and Skills
Schools Building Projects Data
John Curran (Dublin Mid West, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
205. To ask the Minister for Education and Skills to set out the number of schools in Dublin mid-west that have applied for the 2017 summer works scheme; when decisions on applications for the summer works scheme will be returned; and if he will make a statement on the matter. [11397/17]
John Curran (Dublin Mid West, Fianna Fail)
Link to this: Individually | In context | Oireachtas source
207. To ask the Minister for Education and Skills to set out in tabular form the details of schools that are included in the six-year construction programme 2016 to 2021 in Dublin mid-west; the status of each school's stage in the programme; and if he will make a statement on the matter. [11399/17]
Richard Bruton (Dublin Bay North, Fine Gael)
Link to this: Individually | In context | Oireachtas source
I propose to take Questions Nos. 205 and 207 together.
I wish to advise the Deputy that my Department does not hold information on the basis of the geographic area that he has outlined.
However, with regard to the Summer Works Scheme (SWS) 2016/2017, details of all successful school applicants, including schools in Dublin, in respect of Categories 1 and 2 for Gas and Electrical works, were announced last April and may be accessed on my Department’s website .
Assessment of valid projects in further categories of the SWS is now being undertaken by my Department, subject to the overall availability of funding, in accordance with the terms and conditions of the scheme as outlined in Circular Letter (0055/2015), and can also be accessed on my Department's website. It is my intention to publish a list of successful applicants in due course.
With regard to the Deputy's second question relating to the schools included in the 6 Year Construction Programme 2016-2021, I have set out in tabular form a list of schools in the Lucan, Dublin 22 and Dublin 24 areas including details of the current status of each project.
County | Roll Number | School Name and Address | School Type | Status Notes |
---|---|---|---|---|
Co Dublin | 76454S | New Post Primary School - Lucan, Co Dublin | Post Primary | New school opening September 2017. Site to be acquired |
Co Dublin | 19542R | St Thomas Junior NS, Lucan, Co. Dublin | Primary | Stage 2b -- Detailed Design Stage |
Co Dublin | 19676P | Scoil Aine NS, Lucan, Co. Dublin | Primary | Stage 2b-- Detailed Design Stage |
Co Dublin | 19865S | Archbishop Ryan Junior, Lucan, Co Dublin | Primary | Stage 2b-- Detailed Design Stage |
Co Dublin | 20187H | Archbishop Ryan Senior, Lucan, Co. Dublin | Primary | Stag2 2b -Detailed Design Stage. |
Co Dublin | 60263V | St. Joseph's College, Lucan, Co. Dublin | Post Primary | Stage 2b-- Detailed Design Stage. |
Co Dublin | 70080T | Lucan CC, Esker Drive, Lucan, Co Dublin | Post Primary | Stage 2A-- Developed Design Stage |
Co Dublin | 91301D | Holy Family Community School , Rathcoole, Co Dublin | Post Primary | Stage 2b---Detailed Design Stage |
Dublin 22 | 19590F | Scoil Mochua Clondalkin, Dublin 22 | Special School | Schedule of accommodation being developed |
Dublin 22 | 19855P | Gaelscoil na Camóige, Clondalkin, Dublin 22 | Primary | Stage 2A - Developed Design Stage |
Dublin 22 | 19991A | Gaelscoil Chluain Dolcáin, Clondalkin, Dublin 22 | Primary | Stage 2A -Developed Design Stage. |
Dublin 24 | 19462T | Naomh Maolruain (Jnr), Oldbawn, Tallaght, Dublin 24 | Primary | Stage 2A - Developed Design stage |
Dublin 24 | 19463V | Naomh Maolruain (Snr), Oldbawn, Tallaght, Dublin 24 | Primary | Stage 2A - Developed Design stage |
Dublin 24 | 19702N | St Thomas Junior NS, Jobstown, Tallaght, Dublin 24 | Primary | Architectural planning to be initiated |
Dublin 24 | 76293U | Kingswood Post Primary, Tallaght, Dublin 24 | Post Primary | At tender Stage |
Dublin 24 | To be determined | New Post Primary School - Firhouse/Oldbawn Dublin 24 | Post Primary | New school opening September 2018. Site to be acquired |
No comments