591. To ask the Minister for Transport, Tourism and Sport the potential investment projects his Department put forward to the Department of Finance task force report for the European Fund for Strategic Investment. [2675/17]

Photo of Shane RossShane Ross (Dublin Rathdown, Independent)
Link to this: Individually | In context | Oireachtas source

I set out in the following table a list of projects put forward in 2014 as potential projects for EFSI funding by my Department.

The Department agreed the submission of the list to the Department of Finance. In doing so, it recognised that this was a technical list of potential projects and that inclusion on the list did not imply any commitment to State funding.

Project nameImplementing agencyDescription
Ringaskiddy DevelopmentPort of Cork CompanyPort Quay Infrastructure, Cruise Terminal,
Alexander Basin RedevlopmentDublin Port CompanyRedevelopment/reconfiguration of Alexandra Basin to accommodate larger ships and to provide for a substantial increase in port capacity.
Improvement of the access and hinterland connection of Foynes PortShannon Foynes Port CompanyReinstatement of the existing rail line to the port, improvement works to existing quay and jetty infrastructure and removal of internal transport bottlenecks within the port.
Port improvement worksPort of WaterfordNew training walls and pilot facilities
Regional Port DevelopmentGalway Portreclaim and develop a new port adjacent to existing port. Port Quay Infrastructure, Cruise Terminal,
Regional Port DevelopmentDrogheadaNew training walls
Regional Port DevelopmentDun LaoireQuay Infrastructure, Cruise Terminal
M7 Naas to New bridge Bypass WideningNRABottleneck on the N7 with 6 lanes at northern end & 8 lanes at southern end feeding into 4 lanes on Core Corridor
Sallins Bypass & Osberstown InterchangeKildare County CouncilNew Interchange and bypass needed to address congestion and facilitate access to public transport at Sallins
N8/N25 Dunkettle InterchangeNRANew Interchange to address congestion on Core Corridor
Coonagh/KnockalisheenLimerick CouncilRoad Link needed for urban regeneration
N22 Ballyvorney to MacroomNRARoad upgrade to main road link between Cork and Kerry
Moycullen BypassNRABypass to address congestion on tourist route and business access to Galway
N5 Westport to TurloughNRARoad upgrade to link between Castlebar and Westport
N4 Collooney to CastlebaldwinNRARoad upgrade to link with high accident record between Collooney and Castlebalwin
N59 Mulranny to WestportNRARoad upgrade needed on tourist route
N56 Dungloe to GlentiesNRARoad upgrade needed on tourist route
Sligo East Garvogue linkSligo CouncilRoad link needed for urban regeneration
N28 Cork to RingaskiddyNRARoad Link on a core corridor to connect with a Tier 1 Port
N6 Galway City Outer By-PassNRABypass to address congestion on tourist route and business access to Galway
A5 Derry to the BorderTransport Northern IrelandUpgrade the A5 from Derry to the Border to dual carriageway standard
Project HangarShannon Group plcConstruction of a c.6,751 square metre wide body hangar to facilitate the creation of jobs and development of the aviation cluster in Shannon, County Clare, Ireland.
Project RunwayShannon Group plcFull renewal of the Shannon Airport runway to maintain the airport's operating status and its position on the comprehensive Trans-European Transport Network.
Project CorporateShannon Group plcDevelopment of corporate-aviation and cargo terminal infrastructure in Shannon, County Clare, Ireland, as well as establishment of corporate aircraft register. Project is designed to leverage Free Zone status increase total EU MRO activity for corporate aircraft with associated benefits for employment, as well as facilitating cargo transhipment through EU and associated export processing.
Project Hangar IIShannon Group plcConstruction of a second c.6,751 square metre wide body hangar to facilitate the creation of jobs and development of the aviation cluster in Shannon, County Clare, Ireland.
Project OfficeShannon Group plcConstruction of a number of fourth generation office blocks in the Shannon Free Zone, County Clare, Ireland. The blocks will be constructed to provide comparable office space to current non-EU offerings such as Dubai and to ensure Europe remains a leading player in global aviation.
Project AirportShannon Group plcRefurbishment of Shannon Airport terminal building to safeguard the airport's ability to continue to operate as a part of the Trans-European Transport Network, implement the highest levels of energy efficiency and ensure a positive customer experience.
Project Hangar IIIShannon Group plcConstruction of a third c.6,751 square metre wide body hangar to facilitate the creation of jobs and development of the aviation cluster in Shannon, County Clare, Ireland.
New Parallel Runway at Dublin Airportdaa plcNew parallel runway (10/28) to the north of the existing 10/28 runway.
Swiftway BRT on Swords Airport CorridorNational Transport AuthorityScheme to meet short-medium term needs of Swords, Dublin Airport to City Centre corridor with 24 stops identified at key locations.
DART UndergroundNational Transport AuthorityThis project is made up of 2 elements – 1. The development of an underground tunnel (the DU project) between Docklands and Inchicore which will serve a number of key locations in the city centre with underground stations (previously known as the "Interconnector" tunnel) 2. A series of associated/related works including the City Centre Resignalling project (underway), Resignalling and electrification of the Maynooth line, Electrification to Drogheda, a new Centralised Traffic Control Centre (CTC), Elimination of level-crossings, the Kildare Route Project Phase 2, and the expansion of the DART fleet and associated depot facilities.
North Dublin Swords Airport Corridor Rail LinkNational Transport AuthorityRail project on Swords/Airport corridor to meet long term needs of one of the fastest growing regions
Swiftway (BRT) Blanchardstown to UCDNational Transport AuthorityScheme will serve corridor between Blanchardstown and UCD including the City Centre with 34 stops identified at key locations.
Swiftway BRT Clongriffin to TallaghtNational Transport AuthorityScheme will serve the corridor linking Clongriffin, the City Centre and Tallaght, no. of stops to be finalised.
SUB -SET of DART U --DART Extension to BalbrigganNational Transport AuthorityPart of the DART Underground Programme, which will contribute towards the removal of the bottleneck at Connolly station, including for the Enterprise cross-border train service.
SUB -SET of DART U -DART Extension to MaynoothNational Transport AuthorityPart of the DART Underground Programme, involving the removal of Level-Crossings, Re-signalling & Electrification, it will have capacity & frequency benefits in and of itself.
SUB -SET of DART U -Central Traffic Control CentreNational Transport AuthorityPart of DART U Programme -New Central Traffic Control Centre required to increase capacity and improve safety
LUAS extensionsNational Transport AuthorityTo be decided. Possible routes include Lucan & Bray extensions.