Written answers

Thursday, 8 October 2015

Photo of Bernard DurkanBernard Durkan (Kildare North, Fine Gael)
Link to this: Individually | In context | Oireachtas source

109. To ask the Minister for Defence the extent to which he expects the Air Corps to benefit from recent reviews and discussions with particular reference to modernisation and development in line with similar forces throughout Europe; and if he will make a statement on the matter. [35126/15]

Photo of Simon CoveneySimon Coveney (Cork South Central, Fine Gael)
Link to this: Individually | In context | Oireachtas source

The equipment priorities for the Army, Air Corps and the Naval Service will be considered in the context of the lifetime of the recently published White Paper. The White Paper recognises that there are several new and or enhanced platforms to be procured. In the context of the Air Corps fleet, this includes the replacement of the Cessna fleet with three larger aircraft suitably equipped for Intelligence, Surveillance, Target Acquisition and Reconnaissance tasks. The two CASA 235s Maritime Patrol Aircraft are due for replacement in 2019. The CASA’s will be replaced with consideration of their replacement with larger more capable aircraft to enhance maritime surveillance and to provide a greater degree of utility for transport and cargo carrying tasks. The existing Pilatus PC9 aircraft are not due for replacement until 2025.

The current EC 135 and AW 139 helicopter fleet in the Air Corps will continue to deliver the required Defence Forces support and other support capabilities over the lifetime of the White Paper.

Comments

No comments

Log in or join to post a public comment.