Written answers

Wednesday, 6 May 2015

Department of Communications, Energy and Natural Resources

North-South Interconnector

Photo of Brendan SmithBrendan Smith (Cavan-Monaghan, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

575. To ask the Minister for Communications, Energy and Natural Resources if he will give urgent consideration to the contents of the motion passed by Monaghan County Council on the proposed North-South interconnector (details supplied); and if he will make a statement on the matter. [17736/15]

Photo of Alex WhiteAlex White (Dublin South, Labour)
Link to this: Individually | In context | Oireachtas source

I have taken note of the Motion referred to by the Deputy in his Question.

In January 2014, an Independent Expert Panel (IEP) was established to oversee the integrity of the process being undertaken by EirGrid to report on comprehensive, route-specific studies of overhead and underground options for both the Grid Link (GL) and Grid West (GW) projects. While the North South Transmission Line project (N/S) is outside the IEP's Terms of Reference, the IEP did agree, on foot of a request by my predecessor, to provide an opinion on the compatibility of the methodologies, to be employed on the GL and GW projects with what had already been done on the N/S project up to and including 2 May 2014, being the date that the IEP decided to examine the N/S project.

Having considered and discussed all of the material, the Panel issued a statement on 1 July 2014, indicating its unanimous opinion that, in all material respects, what had already been done on the N/S project is compatible with the methodologies being employed on the GW and GL projects.

On 27 March 2015 EirGrid published a new independently peer reviewed draft Strategy which allows for the achievement of an optimal balance between the competing demands of publicly consulting on necessary network development, choosing the best emerging technology options for that development, and minimising new build. The draft strategy found that there remains a clear need for the North South transmission line, and that the existing proposal for a 400kV overhead line remains the most appropriate solution for the project.

Comments

No comments

Log in or join to post a public comment.