Schools Building Projects Status

Photo of Finian McGrathFinian McGrath (Dublin North Central, Independent)
Link to this: Individually | In context | Oireachtas source

166. To ask the Minister for Education and Skills if she will provide the maximum support to a school (details supplied) in Dublin 13 regarding the school building; and if she will make a statement on the matter. [40819/14]

Photo of Jan O'SullivanJan O'Sullivan (Limerick City, Labour)
Link to this: Individually | In context | Oireachtas source

The major building project referred to by the Deputy is currently at Stage 2A of Architectural Planning. The Patron Body and their Design Team are finalising the Stage 2A report for presentation to my Department.

Upon completion of this presentation and submission of the report, subject to no issues arising, this project will be authorised to proceed to Stage 2B - Detailed Design Stage which includes applications for Planning Permission, Fire Safety Certification, Disability Access Certification and the preparation of tender documents.

Due to competing demands on the Department's capital budget imposed by the need to prioritise the limited funding available for the provision of additional school accommodation to meet increasing demographic requirements it was not possible to include this project in the 5 year construction programme announced in March 2012.

School building projects, including the project referred to by the Deputy, which were previously initiated but not included in the current five year construction programme will continue to be progressed to final planning stages in anticipation of the possibility of further funds being available to the Department in the future.