145. To ask the Tánaiste and Minister for Foreign Affairs and Trade the number of hours overtime worked by staff of the Passport Office in 2011, 2012 and 2013; the cost associated with this overtime; and if he will make a statement on the matter. [15285/14]

Photo of Eamon GilmoreEamon Gilmore (Dún Laoghaire, Labour)
Link to this: Individually | In context | Oireachtas source

The following is a summary of the overtime hours worked in the Passport Offices in Molesworth Street, Balbriggan and Cork for the years 2011, 2012 and 2013 and the salary costs associated with those overtime hours.

YearHoursCost
201127600€762,118.78
20128212€228,723.88
2013775€86,871.33

In recent years the Department has made strenuous efforts to reduce its overtime bill, particularly in the Passport Service, and it will be noted from the figures that there has been a substantial reduction on overtime costs between 2011 and 2013. This has been achieved in the face of record levels of demand in 2012 and with continuing reductions in full-time staff. The achievement of savings in overtime costs has resulted from a number of factors, including the streamlining of existing arrangements for processing of applications at the public counters and the introduction of a scheduled appointment service. The old system for processing applications at public counters was a particularly time-consuming and staff-intensive feature of the service.

Other changes have been introduced with regard to acceptance of applications by ordinary post which had a high rejection rate and consequently more processing time and cost. This change has resulted in greater use of the Passport Express service provided by An Post and this has also contributed to efficiencies. A further significant change has been the earlier deployment of temporary staff for seasonal demand. This has resulted in better levels of efficiency and productivity being achieved in dealing with the summer peak period.