Written answers

Tuesday, 30 April 2013

Department of Education and Skills

Rainwater Harvesting Systems Provision

Photo of Charlie McConalogueCharlie McConalogue (Donegal North East, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

228. To ask the Minister for Education and Skills if he will provide funding to schools who wish to install a rainwater harvesting system; and if he will make a statement on the matter. [20040/13]

Photo of Ruairi QuinnRuairi Quinn (Dublin South East, Labour)
Link to this: Individually | In context | Oireachtas source

I wish to advise the Deputy that rainwater harvesting systems were first introduced for major school building projects in 2008. Since then all major school building projects, where site conditions and circumstances allow and where economically viable to do so, can incorporate a rainwater harvesting system into their accommodation brief. While fitting the systems in new schools during construction is relatively straightforward, retrofitting them in existing schools is much more difficult and expensive because of the various dedicated pipe work systems both within the building and externally underground and the amount of making good work that is required in each instance.

I also wish to inform the Deputy that for existing buildings it is more cost effective to minimise the demand for water firstly through installing measures to reduce water usage such as push type spray taps, low flushing toilets, urinal controls, repairing leaks etc. To this end schools were invited in 2010 to apply for Water Conservation measures and funding of almost €10m was made available to promote water conservation measures as part of this initiative.

Comments

No comments

Log in or join to post a public comment.