Photo of Leo VaradkarLeo Varadkar (Dublin West, Fine Gael)
Link to this: Individually | In context

Question 137: To ask the Minister for Finance the position regarding works planned for the main road in the Phoenix Park which were promised to the finance committee during the Estimates meeting; and if he will make a statement on the matter. [34551/10]

Photo of Martin ManserghMartin Mansergh (Tipperary South, Fianna Fail)
Link to this: Individually | In context

A Design Team has been appointed to progress and oversee this Project, which relates to the repair/reinstatement of the Chesterfield Avenue, the main road through the Phoenix Park, Dublin. The Design Team is advancing with the preparation of the necessary documentation to allow for the required formal tender process to be undertaken. A number of surveys critical to the finalisation of the tender specifications are currently underway along Chesterfield Avenue and the findings from these surveys are awaited and will be available shortly. The required tender process will then be undertaken without delay. While the final scope of works will determine the actual duration of the construction phase of this project, it is considered feasible at this point that works could be completed within the first half of 2011.

Comments

No comments

Log in or join to post a public comment.