Written answers

Tuesday, 31 March 2009

Department of Health and Children

Care of the Elderly

9:00 pm

Photo of Andrew DoyleAndrew Doyle (Wicklow, Fine Gael)
Link to this: Individually | In context

Question 202: To ask the Minister for Health and Children the long-term policy and plan for upgrading nursing homes; the criteria used for closing nursing homes; the consultation process with residents and staff of affected nursing homes; and if alternative measures are considered to improve standards before the closure option is chosen. [12956/09]

Photo of Máire HoctorMáire Hoctor (Tipperary North, Fianna Fail)
Link to this: Individually | In context

In preparation for the introduction of the new national standards for residential care settings for Older People the Health Service Executive has put in place a comprehensive programme of preparation to ensure that its public facilities will be in a position to comply with the requirements of the standards. This preparation has focused on two particular areas to ensure that:

1. Policies, procedures and overall service are sufficient to meet the new standards.

2. The overall infrastructure is adequately developed on a phased basis.

The Executive established a Residential Standards National Reference Group which included Managers/Directors of Nursing of HSE residential facilities and each residential care setting is currently undertaking work to benchmark their facility against the standards in order to identify and address the deficits that can be addressed on a cost neutral basis.

In 2006, at the request of the Department, the Executive carried out an assessment of need for residential care for older people in preparation for both the impending standards and the National Development Plan 2009-2013. As part of this work, an assessment was undertaken to establish the extent to which existing public residential accommodation required replacement in the context of emerging standards, but also in the context of wider environmental and structural requirements including health & safety, fire and other criteria.

The HSE has undertaken to commence a phased programme of sustained reconfiguration and development over the next 6 years in order to be in a position to meet the statutory requirements provided for in the new national standards. In terms of reconfiguration and development the focus of the HSE's programme is to target the highest priority locations in the first instance and progressing over time, within the resources available, to bring all our facilities up to the required standards. The 2009 National Service Plan sets out its plan for the management and configuration of public long-term residential care services.

The plan identifies a requirement to reduce the number of long-term residential care beds in some parts of the country, particularly where the standard of facilities is considered inadequate and where it is necessary to addresses infrastructural deficits in order to meet Health & Safety and Fire Requirements and the new standards. Where existing residents have to be relocated, the HSE works closely with the residents and their families to explain what options are available to them with a view to agreeing their preferences for relocation and ensuring that they are relocated to other facilities which will best meet their needs. It is also involved in an information and consultation process with both staff and their representative organisations and efforts will be made to accommodate preferences according to current best HR practice and HSE standards.

Comments

No comments

Log in or join to post a public comment.