Written answers

Wednesday, 4 February 2009

Department of Defence

Air Corps Strength

9:00 pm

Photo of Bernard DurkanBernard Durkan (Kildare North, Fine Gael)
Link to this: Individually | In context

Question 221: To ask the Minister for Defence the extent to which it is intended to increase the strength of the Air Corps; if it is intended to upgrade or replace equipment including air craft; and if he will make a statement on the matter. [3792/09]

Photo of Willie O'DeaWillie O'Dea (Limerick East, Fianna Fail)
Link to this: Individually | In context

The White Paper on Defence of February 2000 set out a figure of 10,500 personnel for the Permanent Defence Force (Army 8,426, Naval Service 1,144, Air Corps 930) as the strength sufficient to meet all foreseeable military requirements for the period comprehended by the White Paper (i.e. up to 2010). This remains the position.

In common with other areas of the public service a reduction of 3% in payroll costs has been applied to the Defence Forces. Recruitment was suspended in late 2008 pending a review of the best means by which to achieve this reduction. My officials and the military authorities are keeping the situation under close review on an ongoing basis. The review and any subsequent recruitment in 2009 will prioritise the operational requirements of the Defence Forces.

As the Deputy may be aware, a very significant level of investment in new equipment for the Air Corps has taken place in recent years. The comprehensive investment programme included the delivery of eight Pilatus training aircraft at a total cost of €60m, the acquisition of two light utility EC 135 helicopters from Eurocopter S.A.S. at a cost of €12.8m, the acquisition of six utility AW 139 helicopters from AgustaWestland, Italy at a cost of €75m and a major mid life upgrade on the two CASA maritime patrol aircraft at a cost of €16.5m.

The issue of the replacement of the Air Corps Cessna Fleet has been considered by my Department in consultation with the military authorities. The question of funding the replacement programme has to be considered in tandem with the overall equipment requirements of the Defence Forces generally and the funding available for this. The Cessna replacement programme is not a current priority and as such, there is no specific provision in this year's Defence Estimates for this project.

Comments

No comments

Log in or join to post a public comment.