Question 457: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46826/08]

Photo of John GormleyJohn Gormley (Dublin South East, Green Party)
Link to this: Individually | In context

The Gorey Sewerage Scheme is included for funding under my Department's Water Services Investment Programme 2007-2009, based on an assessment of needs by Wexford County Council in 2006.

The Council's contract documents for the scheme are being examined in my Department and are being dealt with as quickly as possible.

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 458: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46827/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 459: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46828/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 460: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46829/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 461: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46830/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 463: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46832/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 464: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46833/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 466: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46835/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 468: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46837/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 469: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46838/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 470: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46839/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 471: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46840/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 472: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46841/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 473: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46842/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 474: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46843/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 475: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46844/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 476: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46845/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 477: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46846/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 478: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46847/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 479: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46848/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 481: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46850/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 482: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46851/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 484: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46853/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 486: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46855/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 489: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46858/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 490: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46859/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 491: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46860/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 492: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46861/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 493: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46862/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 495: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46864/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 496: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46865/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 497: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46866/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 498: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46867/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 500: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46869/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 501: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46870/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 502: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46871/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 503: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46872/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 504: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46873/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 505: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46874/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 506: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46875/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 507: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46876/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 510: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46879/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 511: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46880/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 514: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46883/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 515: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46884/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 516: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46885/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 517: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46886/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 518: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46887/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 519: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46889/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 520: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46890/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 522: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46892/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 524: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46894/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 525: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46895/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 527: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46897/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 528: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46898/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 529: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46899/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 530: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46900/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 531: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46901/08]

Photo of John GormleyJohn Gormley (Dublin South East, Green Party)
Link to this: Individually | In context

I propose to take Questions Nos. 458 to 461, inclusive, 463, 464, 466, 468 to 479, inclusive, 481, 482, 484, 486, 489, 490 to 493, inclusive, 495 to 498, inclusive, 500 to 507, inclusive, 510, 511, 514 to 520, inclusive, 522, 524, 525 and 527 to 531, inclusive together.

There are no sewerage schemes for any of these locations included in my Department's Water Services Investment Programme 2007-2009, a copy of which is available in the Oireachtas Library.

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 462: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46831/08]

Photo of John GormleyJohn Gormley (Dublin South East, Green Party)
Link to this: Individually | In context

The Bunclody Sewerage Scheme has been approved for funding under my Department's Water Services Investment Programme 2007-2009 as part of the Rural Towns and Villages Initiative, based on an assessment of needs by Wexford County Council in 2006.

I have approved the Council's tender recommendations for the scheme and it is a matter for the Council to arrange for the carrying out of the works.

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 465: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46834/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 467: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46836/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 483: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46852/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 485: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46854/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 487: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46856/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 508: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46877/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 512: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46881/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 521: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46891/08]

Photo of John GormleyJohn Gormley (Dublin South East, Green Party)
Link to this: Individually | In context

I propose to take Questions Nos. 465, 467, 483, 485, 487, 508, 512 and 521 together.

These schemes are being advanced as a single grouped project and are included for funding under my Department's Water Services Investment Programme 2007-2009, based on an assessment of needs by Wexford County Council in 2006. The Council's Preliminary report for the grouped scheme is being examined in my Department and is being dealt with as quickly as possible.

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 480: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46849/08]

Photo of John GormleyJohn Gormley (Dublin South East, Green Party)
Link to this: Individually | In context

The Enniscorthy Sewerage Scheme is included for funding under my Department's Water Services Investment Programme 2007-2009, based on an assessment of needs by Wexford County Council in 2006.

My Department is awaiting submission of Wexford County Council's contract documents for the scheme.

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 488: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46857/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 499: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46868/08]

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 513: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46882/08]

Photo of John GormleyJohn Gormley (Dublin South East, Green Party)
Link to this: Individually | In context

I propose to take Questions Nos. 488, 499 and 513 together.

These schemes have been approved for funding under the Serviced Land Initiative measure of my Department's Water Services Investment Programme 2007-2009, based on an assessment of needs by Wexford County Council in 2006.

My Department has approved the Council's design proposals for the schemes and, in accordance with devolved procedures, it is now a matter for the Council to proceed with the works.

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 494: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46863/08]

Photo of John GormleyJohn Gormley (Dublin South East, Green Party)
Link to this: Individually | In context

This scheme is included for funding under my Department's Water Services Investment Programme 2007-2009, based on an assessment of needs by Wexford County Council in 2006. I understand that the scheme is under construction and information in relation to expected completion and commissioning dates may be sought from Wexford County Council.

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 509: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; and when construction and commissioning is expected to be completed in respect of these schemes. [46878/08]

Photo of John GormleyJohn Gormley (Dublin South East, Green Party)
Link to this: Individually | In context

I understand that construction work on this scheme, which was funded under my Department's Water Services Investment Programme, has been completed. Information in relation to the commissioning date may be sought from Wexford County Council.

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 523: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; and when construction and commissioning is expected to be completed in respect of these schemes. [46893/08]

Photo of John GormleyJohn Gormley (Dublin South East, Green Party)
Link to this: Individually | In context

The Fethard Sewerage Scheme is included for funding under my Department's Water Services Investment Programme 2007-2009, based on an assessment of needs by Wexford County Council in 2006.

My Department is awaiting submission of the Council's contract documents for the scheme.

Photo of Paul KehoePaul Kehoe (Wexford, Fine Gael)
Link to this: Individually | In context

Question 526: To ask the Minister for the Environment, Heritage and Local Government when the initial application for funding regarding an area (details supplied) was received by his Department for funding; when his Department received preliminary reports; when his Department expected to sanction approval to the local authority in respect of these schemes to proceed to tender and construction; when construction and commissioning is expected to be completed in respect of these schemes. [46896/08]

Photo of John GormleyJohn Gormley (Dublin South East, Green Party)
Link to this: Individually | In context

I understand that construction work on the Coolgreaney Sewage Scheme, which was funded under my Department's Water Services Investment Programme, has been completed. Information in relation to the commissioning date may be sought from Wexford County Council.