Written answers

Thursday, 30 June 2005

8:00 pm

Photo of Enda KennyEnda Kenny (Mayo, Fine Gael)
Link to this: Individually | In context

Question 266: To ask the Minister for Finance the amount of his Department's budgetary allocation for 2004; the amount of this allocation which was returned to the Department of Finance at year's end; the vote head from which such returned allocations were derived; and if he will make a statement on the matter. [23974/05]

Photo of Brian CowenBrian Cowen (Laois-Offaly, Fianna Fail)
Link to this: Individually | In context

The 2004 gross allocation to my Department's Vote was €127.753 million. The net allocation, having deducted estimated appropriations-in-aid of €0.412 million, was €127.342 million. The provisional outturn figures for 2004 were €91.579 million gross and €90.548 million net. The provisional surplus for surrender to the Exchequer was €36.794 million.

The 2004 provisional surplus was derived from the subheads set out in the following table and a note has been appended: (a) Where the saving is significant, i.e. where it exceeds €10,000 and represents 25% or more of an administrative subhead allocation, or where it exceeds €10,000 and represents 5% or more of a programme subhead allocation — this is in line with the presentation of such information in the appropriation accounts; (b) Where part of the savings on a subhead were vired to meet additional expenditure on another subhead and as such were not available for surrender to the Exchequer.

Administrative Subheads — Provisional Savings Description Variation (Saving) from Estimate €000 Note
A.1 Salaries, Wages and Allowances 1,070
A.2 Travel and Subsistence 166
A.3. Incidental Expenses 1,644 Savings arose primarily in respect of an administrative contingency provision which was not required in 2004.
A.4 Postal and Telecommunications Services 148
A.5 Office Machinery and Other Office Supplies 626
A.6 Office Premises Expenses 90
A.7 Consultancy Services 270 The saving is due to reduced and delayed spending on a number of consultancies.
A.8. Centre for Management And Organisation Development 213 A number of projects, including a HRMS pension interface, were not proceeded with in 2004.
â'¬1.049 million of the above savings were used to offset excess expenditure on subhead A.9 (European Presidency).
Programme Subheads — Provisional Savings Description Variation (Saving) from Estimate €000 Note
B. Consultancy Services 2,523 Spending under this subhead can vary significantly from year to year due to legal and financial issues. The subhead also contained a programme contingency provision which was not required in 2004.
E. Ordnance Survey Ireland (Grant-In-Aid) 10,331 Ordnance Survey Ireland did not require the level of grant-in-aid provided for in the estimate as they had a significant cash surplus accumulated from the previous year.
F Gaeleagras Na Seirbhíse Poiblí 12
G. Civil Service Arbitration and Appeals Procedures 24 There were fewer sittings of the boards in 2004 than anticipated.
H.1 Review Body on Higher Remuneration in the Public Service 1
H.2 Public Service Benchmarking Body 1 Token provision
H.3 Committee for Performance Awards 10 The estimate included a provision for consultancy expenditure which, in the event, was not required in 2004.
I. Contribution to the Common Fund for Commodities 182 Ireland's expenditure in respect of its contribution to the UN Common Fund for Commodities was less than originally anticipated.
J.1. Structural Funds Technical Assistance and other Costs 621 Savings arose as a result of staffing changes, leading to reduced activities and lower programme costs in 2004. €1 million was vired to meet a supplementary estimate for N.2 (Northern Ireland Interreg).
J.2. Technical Assistance costs of Regional Assemblies 1 Some €0.5 million was vired to meet a supplementary estimate for N.2 (Northern Ireland Interreg) and a token balance was surrendered to the Exchequer.
K. Committees and Commissions 120 This is a demand-led scheme. There was no expenditure under this subhead in 2004 as no situations arose which required investigation by commissions or committees.
M. Change Management Fund 907 This shortfall reflects the extent to which Departments and offices did not claim reimbursement of expenditure incurred in relation to projects approved for support by the Fund.
N.2 Northern Ireland Interreg 100 Savings of €8.8 million were vired into this subhead, of which €100,000 was unspent at year-end.
N.3 Special EU Programmes Body 179 The saving arose due to lower staff costs in 2004.
O. Ireland-Wales and Transnational Interreg 200 Expenditure did not reach anticipated levels due, inter-alia, to certain contributions to multi-annual transnational programmes not being called for in 2004.
P. Information Society 2,098 A number of projects which were expected to draw down considerable funding in 2004 did not commence or proceeded more slowly than was anticipated.
Q. Civil Service Childcare Initiative 1,252 Delays in the identification and purchase of sites for crèches in a number of locations led to the reduced outturn in 2004. Some €1 million was vired to meet a supplementary estimate for N.2 (Northern Ireland Interreg.) and the balance was surrendered to the Exchequer.
R. Procurement Management Reform 755 The slower than anticipated roll-out of this programme led to the savings identified.
S. Decentralisation Fund 13,701 The estimate of €20 million was to meet any up-front investment required under the Government's decentralisation programme. However, it was subsequently decided to meet the capital costs that arose (site acquisition deposits) from Vote 10 Office of Public Works. €6.299 million was vired to meet a supplementary estimate for N.2 (Northern Ireland Interreg) and the balance was surrendered to the Exchequer.
T. Appropriations-In-Aid 619

Comments

No comments

Log in or join to post a public comment.