I welcome the Minister of State, Deputy Parlon. I have discussed this issue previously with him and also with the Minister for Finance.

I ask that the work which was started over 40 years ago on the River Nanny would be completed. One of the reasons for stopping the work is that the river was involved in providing a water supply for the town of Tuam. However, the water supply in north Galway is now supplied by the River Corrib.

A localised flood relief scheme was considered some years ago under the Arterial Drainage (Amendment) Act 1995 and the work begun on a drainage catchment area should be completed. There is no excuse for this not to happen as the water supply for Tuam now comes from a different source. It would be of great benefit if this were to be done, especially to the farmers in the area, as periodic flooding is a problem. Farm buildings have been affected over the years. I have brought Ministers to see this flooding on many occasions. The project would not involve a great deal of money, although I was unable to get an estimate.

I was glad to hear the Minister for the Environment, Heritage and Local Government refer in recent days to a western basin management project. While this does not come under the remit of the Minister of State, Deputy Parlon, it refers to the Corrib and Clare rivers. I hope the Minister of State can give me some indication of an intention to complete this work and an indication of the cost involved in tackling the periodic flooding in this area. This would be of great benefit to farmers and the wider community in the north Galway area.

Tom Parlon (Laois-Offaly, Progressive Democrats)
Link to this: Individually | In context

Drainage works on the River Nanny formed part of the Corrib-Clare catchment drainage scheme carried out by OPW in the 1960s. However, as the water supply for Tuam was taken from the River Nanny it was not possible to carry out that part of the scheme. Approximately 17 km. of the river and its tributaries were affected.

In 1998, a new water supply was provided in Tuam and the question of completing the work on the River Nanny was proposed by local landowners and public representatives. Clearly, this proposal has to be considered in the current context and not as the final part of a scheme designed and carried out in the 1960s. As the Senator is aware, a policy decision was taken in the 1980s to discontinue arterial drainage schemes. The emphasis is now focused more on the local rather than the catchment level.

Any proposal for flood relief or drainage works must now meet certain criteria. The proposed works must be technically feasible, must have a positive benefit to cost ratio and must be acceptable on environmental grounds. If all these criteria are met, the overriding consideration of financial resources and the obligation to prioritise these in the areas of greatest need must be borne in mind.

In response to requests for works on the River Nanny, the OPW reviewed the designs, environmental impact and the benefit to cost ratio of the works in the period 2000 to 2001. The estimated cost in that period was €1.3 million. This was based on an outline design only and would be likely to increase as the detailed design developed. The work would extend along a 17 km. stretch and include the widening, deepening and cleaning of the channel as well as replacement of stone arch and stone culvert bridges. The cost benefit analysis concluded that the work would not yield significant benefits because the benefits arising are limited to agricultural lands. Buildings and roads are not significantly affected by the flooding and consequently do not contribute to the benefit calculation.

On the basis of this information, the proposed works for the River Nanny in Tuam are not cost-beneficial and therefore cannot be undertaken by the OPW. I fully appreciate the problems caused for landowners by recurrent flooding. Having said that, I cannot approve the progression of any project that does not represent value for money and unfortunately this is the position I find myself in regarding the proposed works for the River Nanny.

The Senator has referred to repairs to bridges on the River Nanny that are being carried out by Galway County Council. The OPW has had no communication from the county council about these and therefore I presume that the county council considers that such works are a local authority matter.

Photo of Michael KittMichael Kitt (Fianna Fail)
Link to this: Individually | In context

Will the Minister of State consult the Minister for the Environment, Heritage and Local Government to see if this issue could be considered under the new western river basin management project announced last week?

Tom Parlon (Laois-Offaly, Progressive Democrats)
Link to this: Individually | In context