Dáil debates

Tuesday, 26 April 2022

Ceisteanna ar Sonraíodh Uain Dóibh - Priority Questions

Road Tolls

9:05 pm

Photo of Eamon RyanEamon Ryan (Dublin Bay South, Green Party) | Oireachtas source

Under the Roads Acts, 1993 to 2015, the operation and management of individual national roads is a matter for Transport Infrastructure Ireland, TII, in conjunction with the local authorities concerned and, therefore, matters relating to the day-to-day operations regarding national roads, including toll roads and the establishment of a system of tolls, are within the remit of TII. More specifically, the statutory power to levy tolls, to make toll bye-laws and to enter into agreements with private investors are vested in TII under Part 5 of the Roads Acts.

TII has advised that for operational and safety reasons it is essential that barrier control be retained at the toll plaza. It does not follow that removing the toll would lead to a reduction in carbon emissions. On the contrary, TII is concerned that, on the whole, removing the tolls would lead to an increase in congestion as more cars would be incentivised to use the tunnel. This would result in an increase in fuel consumption and an increase in carbon emissions. Increased levels of congestion in the vicinity of the Dublin Port tunnel would negatively impact the freight and logistics sector.

The tunnel has facilitated the removal of heavy goods vehicles traffic away from Dublin city centre and in so doing has improved the overall environment, air quality and road safety in the city. The road safety improvements have been beneficial for vulnerable road users such as cyclists and pedestrians. Moreover, the tunnel has delivered benefits to Irish road hauliers, providing a reliable connection between Dublin Port and the motorway network.

The tunnel opened to traffic in December 2006. The toll plaza equipment and the control system software date from the design period in the years prior to the opening. TII has confirmed that it intends to go to tender on an upgrade of both the tolling system software and hardware and it aims to implement the upgrade later in 2022 and 2023. This will result in quicker barrier movement and speedier throughput of vehicles, reducing delays at the barrier and increasing the overall reductions in CO2 emissions coming from tunnel usage.

Comments

No comments

Log in or join to post a public comment.