Photo of Eamon RyanEamon Ryan (Dublin Bay South, Green Party) | Oireachtas source

In 1972 the report on the transportation in Dublin study carried out by An Foras Forbartha stated we should build an underground rail connection between Heuston Station and Pearse Street and Connolly Station. In 1975 the report on the Dublin rapid rail transportation study stated the same and that it should be the second phase after the introduction of the Howth to Bray DART line. In 2001 the plan A Platform for Change stated the project was more important than anything else and should take precedence over the widening of the M50. That did not happen. A railway order was issued in December 2011 but subsequently cancelled. The report on the NTA greater Dublin draft transport study for the period 2016 to 2035 brought the measure back in and stated we had to have it.

Does the Minister intend to build it? Will it happen? Are we for real on this issue? Will it be in the plan that will be announced tomorrow?

Comments

No comments

Log in or join to post a public comment.