Dáil debates
Wednesday, 12 March 2008
Electricity Transmission.
1:00 pm
Eamon Ryan (Dublin South, Green Party)
Having said that, there are very different topographic or regional demographic issues in regard to a 440 kV power line which would go 80 km through drumlin country versus a smaller grid connection that might be applied in the west or in a mountainous region. There are obviously different considerations. We are looking for the consultant to bring back information on the implications for different examples. In that regard one of the projects we will be looking at specifically is the type of project in which we are engaged in the North-South interconnector. It is not a project-specific study, it is a wider study to help inform that project and many other projects which will have to proceed. In those circumstances, I am reluctant to direct the consultant to take on a meeting, regardless of whether a pressure group is capable and has much experience. At least in the requirement that they review the information provided, as set out in our consultation process, that 300 page report provides a detailed analysis on their specific project.
No comments