2:40 pm
Marc Ó Cathasaigh (Waterford, Green Party)
Link to this: Individually | In context | Oireachtas source
It states:
A significant level of works is required to bring the site up to standard. The average cost per unit of developing sites, including connectivity to services - gas, water and communications - and extensive remediation works on suboptimal sites available is in the region of €150,000.
I fail to grasp how I have €442,000, and if I subtract €150,000 for the actual modular unit, the difference is €292,000. This document indicates the site preparation costs €150,000, in which case I have lost €150,000 that I cannot account for.