Kieran O'Donnell (Limerick City, Fine Gael)
Link to this: Individually | In context | Oireachtas source
Were these carriages all acquired at once or were they acquired over time? Why do we have a situation where there is obviously not the capacity to use the 21 carriages? Planning was probably done for that in 2006 and 2007, which was the height of the Celtic tiger economy. However, it was running on hot stem at that time and at a speed that was not natural. Why was it not done on a phased basis, so that if the demand was not there the carriages would not have to be bought?