456. To ask the Minister for Housing, Planning, and Local Government the funding provided to Wexford County Council Energy Efficiency Retrofit Programme in 2020, 2021 and 2022, in tabular form; and if he will make a statement on the matter. [37957/22]

Photo of Johnny MythenJohnny Mythen (Wexford, Sinn Fein)
Link to this: Individually | In context | Oireachtas source

457. To ask the Minister for Housing, Planning, and Local Government the number of council-owned housing stock in County Wexford that has been brought to a building energy rating, BER, level B2 or above in 2020, 2021 and 2022, in tabular form. [37958/22]

Photo of Johnny MythenJohnny Mythen (Wexford, Sinn Fein)
Link to this: Individually | In context | Oireachtas source

458. To ask the Minister for Housing, Planning, and Local Government the number of council-owned housing stock in County Wexford that currently has a BER rating level below B2; and if he will make a statement on the matter. [37959/22]

Photo of Darragh O'BrienDarragh O'Brien (Dublin Fingal, Fianna Fail)
Link to this: Individually | In context | Oireachtas source

I propose to take Questions Nos. 456 to 458, inclusive, together.

My Department introduced an Energy Efficiency Programme that commenced in 2013, with the ambition to fund retrofit on all social homes requiring insulation and energy upgrade works. This programme has seen improved energy efficiency and comfort levels in over 75,000 Local Authority homes over the period 2013 to the end of 2021 at a total cost to the exchequer of some €183 million.

For the period 2013 – 2020 Energy Efficiency Works were carried out in two phases:

Phase 1aimed to ensure that the entire social housing stock would have, as a minimum, wall insulation and attic insulation (300mm). To this end, funding was initially targeted at the less intrusive cavity wall insulation as well as attic/roof insulation.

Phase 2focused on the fabric upgrade works to those remaining dwellings with solid/hollow block wall construction and includes the provision of heating upgrades.

This previous programme was withdrawn in 2021 with the introduction of a new holistic Energy Efficiency Retrofit Programme that focuses on ensuring that the fabric of the home is upgraded and an energy efficient heating system is provided. The programme will see a significant upscaling on what has been completed by local authorities in previous years.

This new enhanced ten year energy efficiency programme was launched in response to a commitment made under the Programme for Government, which called for the 'retrofit' of 500,000 homes to a B2/Cost Optimal Equivalent BER standard by 2030, of which approximately 36,500 are expected to be local authority owned homes.

The 2022 Energy Efficiency Retrofitting programme has seen a significant increase in funding support to local authorities to €85 million, allowing approximately 2,400 homes nationally to be upgraded to a B2 or Cost Optimal Equivalent Standard.

A breakdown of the funding provided and the output per local authority since 2013 can be found on the Department website below:

www.gov.ie/en/publication/668c1-energy-efficiency-retrofitting-programme-expenditure-output/.

Work in relation to the 2022 programme is underway but it will be later this year before significant recoupment claims are lodged with my Department. Full details in relation to the 2022 Energy Efficiency Retrofitting Programme will be available early in 2023.

Separately details in relation to those properties that fall below the B2 BER rating should be available directly upon request from the local authority themselves.