Adjournment Matters. - Air Services.

 

A range of options was assessed, including an extension to the existing facility. The preferred option, which emerged from this process, was the construction of a new terminal facility and associated infrastructure. Aer Rianta moved ahead with the preferred option in July 2001 and a planning application was duly lodged. Planning permission was subsequently received in December 2001 and the consultants proceeded with the detailed design of the facilities. The chosen option consists of a range of works including a new 25,000 sq. metres terminal with a capacity for 3 million passengers per annum and all associated facilities, with check-in, baggage handling, hold baggage screening, air-bridges, retail and catering, accommodation, etc, and a new fire station capable of handling the latest generation fire tenders. In addition to the new terminal building, the development will include associated infrastructure and car parking works comprising a central utilities building, replacement of all underground services, a new internal road network, 600 space multi-storey car park and additional surface car parking.

Comments

No comments

Log in or join to post a public comment.