Advanced search
Show most relevant results first | Most recent results are first | Show use by person

Results 1-6 of 6 for aindrias moynihan segment:8833121

Joint Oireachtas Committee on Social Protection: Energy Poverty: Discussion (Resumed) (14 Feb 2024)

Aindrias Moynihan: I acknowledge the huge progress that has been made. Mr. Deegan referred to the waiting times for getting the work done on those different retrofitted homes. This is phenomenal work. It is not just the speed or the time but that it is meaningful change in a household. I acknowledge that. There is large demand on the scheme as well. The wait time to get to the starting line is the big...

Joint Oireachtas Committee on Social Protection: Energy Poverty: Discussion (Resumed) (14 Feb 2024)

Aindrias Moynihan: It is interesting to hear the figure of between eight and ten months. In our experience, it is greater than that. It is closer to one year for people we are dealing with in Cork. It is positive that the Department is looking at bringing in people to do the BER certification because that is the bottleneck. It gets people as far as the starting line and identifies who has the lowest rating...

Joint Oireachtas Committee on Social Protection: Energy Poverty: Discussion (Resumed) (14 Feb 2024)

Aindrias Moynihan: There is, but the more vulnerable are more easily identifiable. They are the ones that are moving, as opposed to anyone with a B or C rating. It is those with the lower BERs that are moving once they get the BER certificate.

Joint Oireachtas Committee on Social Protection: Energy Poverty: Discussion (Resumed) (14 Feb 2024)

Aindrias Moynihan: Will there be targets set for the SEAI on those?

Joint Oireachtas Committee on Social Protection: Energy Poverty: Discussion (Resumed) (14 Feb 2024)

Aindrias Moynihan: The barriers we are identifying are that the more vulnerable-----

Joint Oireachtas Committee on Social Protection: Energy Poverty: Discussion (Resumed) (14 Feb 2024)

Denis Naughten: ...to carry out a lot of the measures under the warmer homes scheme but it is not the case that none of them can be carried out. On the issue of aggregation, there is a massive time lag. Deputy Aindrias Moynihan spoke about the problem in getting the BER assessment carried out but even getting to that, we are talking about ten months. It takes 14 months on average from the time someone...

   Advanced search
Show most relevant results first | Most recent results are first | Show use by person