Seanad: Special Measures in the Public Interest (Derrybrien Wind Farm) Bill 2023: Second Stage (20 Feb 2024)

Joe O'Brien: ...of the wind farm in June 2003. However, work was stopped in October 2003 due to a peat slide that resulted in an ecological disaster polluting the local river, causing the death of approximately 50,000 fish and lasting damage to the fish spawning beds. At that time emergency works were undertaken to protect watercourses, roads and property. Construction of the wind farm was completed in...

Seanad: Special Measures in the Public Interest (Derrybrien Wind Farm) Bill 2023: Second Stage (20 Feb 2024)

Lynn Boylan: ...we heard, during its construction in 2003, there were significant landslides. There was one at turbine 17, which did not halt construction. There was then a second landslide at turbine 68, which dislodged 450,000 cu. m of peat. That peat moved 2.5 km away before sliding further into the Derrywee river, killing 50,000 brown trout and then going on to kill 100,000 fish in total,...

   Advanced search
Show most relevant results first | Most recent results are first | Show use by person