Flood Prevention Measures

7:05 pm

Photo of Patrick O'DonovanPatrick O'Donovan (Limerick County, Fine Gael) | Oireachtas source

I thank the Deputy for raising this important matter. As we approach the winter season, it is opportune that we consider our preparedness as a country to respond to severe weather events such as flooding. I am acutely aware of the impact that the recent flooding has had on individual households and on communities at large, and specifically in the midlands. Since becoming Minister of State with responsibility for the OPW, I have visited several areas affected by recent storms, witnessed the damage caused and spoken with the people and business owners directly affected in Kenmare, Kilmallock, Skibbereen, Bandon, Bantry, Clifden and elsewhere. I compliment and thank the staff of the OPW, the local authorities, the emergency services and those volunteers who have provided assistance to all of those communities that have been affected by the August storms, including in the midlands.

The Government's framework for major emergency management underpins co-ordination of responses to all emergencies in Ireland, including flooding. Through that framework, the Department of Housing, Planning and Local Government is the lead Department with national responsibility for co-ordinating the response to severe weather emergencies, including flooding. Local authorities are designated as the lead agency for responding to flooding events within their administrative areas and for ensuring that effective arrangements are put in place to receive and respond to public service weather warnings issued by Met Éireann.

I recognise the proactive planning of the local authorities in putting in place temporary flood defences and putting response staff on standby in preparation for these recent weather events, including those in the midlands. Their planning and rapid response to flood events helped to mitigate the damage and devastation caused. Each local area has its own individual plan in the event of flooding. An Garda Síochána, the civil defence and the HSE are all involved in these plans and I acknowledge their work in responding to the recent floods as well.

Turning to planning to mitigate flood damage in the future, on 3 May 2018, the OPW launched 29 flood risk management plans and a €1 billion investment in flood risk over the coming decade. These plans are the output from the catchment flood risk assessment and management, CFRAM, programme, the largest ever flood risk study carried out in the State. The plans set out measures proposed to address the flood risk nationally, and include 119 new schemes to protect towns, villages and cities. Procurement for 60 of the 119 flood relief schemes is now progressing and, in some places, is complete. These schemes, with the 46 already complete, will mean that 95% of at-risk properties will be protected by flood relief schemes.

In addition, the OPW is co-ordinating Ireland's whole-of-government approach to flood risk management across three strategic policy areas: prevention, protection and preparedness. The interdepartmental flood policy co-ordination group was established to examine the potential non-structural measures that will inform the ten-year implementation strategy of the flood risk management plans and to ensure the preparation of policies that can benefit communities directly. The Government also established the Shannon flood risk State agency co-ordination working group in 2016 to support existing plans to address flooding on the Shannon and to enhance ongoing co-operation of all State agencies involved with the River Shannon, to which Deputy Cowen referred.

The group has taken several significant decisions since its establishment, including targeted maintenance activities at several locations, trialling the lowering of levels in Lough Allen and a study on the cause, degree and rate of restriction downstream of Parteen weir. In October 2019, the group agreed to a €7 million strategic programme of maintenance and the removal of constrictions or pinch points, as Deputy Cowen called them, on the bed of the River Shannon at the Callows region between Athlone and Meelick weir. Progression of these works will be subject to the full environmental impact assessments required and planning consent to proceed. The decision to undertake these projects was noted by the Government in December 2019 and Waterways Ireland has advised that it has commenced work on advancing the various interventions for these works, with implementation expected to commence in 2021. This investment, as well as helping to manage flooding, can support the tourism, navigation and agricultural sectors for this region.

Regarding water levels on the River Shannon, the ESB manages the weirs, sluices and other works that are part of the Shannon Scheme, and the water levels on Lough Allen, Lough Ree and Lough Derg.

8 o’clock

The levels in between those lakes are managed by Waterways Ireland for navigation purposes. Both organisations are members of the group to which I referred earlier and communicate on a daily basis to ensure a co-ordinated approach to managing the water levels on the river. Queries arising from the protocols of the managing of the water levels at any given time are directed both to the ESB and Waterways Ireland.