Dáil debates

Tuesday, 3 July 2018

Topical Issue Debate

Electricity Transmission Network

6:20 pm

Photo of Denis NaughtenDenis Naughten (Roscommon-Galway, Independent) | Oireachtas source

I thank colleagues for their flexibility in having the debate today rather than last Thursday when I was not available. I welcome the opportunity provided to me by the Deputies to discuss what is an essential electricity grid enhancement project for the midlands. To ensure the national electricity grid is fit for purpose in modern times, it is necessary to carry out grid refurbishment and enhancement on an ongoing basis. In this, EirGrid and ESB Networks work in close co-operation with the ultimate goal of enhancing the national electricity grid in order that it can support Ireland's continued economic development.

I am informed that the Laois-Kilkenny electricity grid reinforcement project is required to improve the security of electricity supply in the midland region. This €110 million investment in the area will ensure the electricity network can meet current and future needs of all users, from homes and farms to small businesses and industrial customers. The Coolnabacca electricity station in County Laois is part of the project, which was granted planning permission in 2014 by An Bord Pleanála. As part of the planning process for the project, an environmental impact statement was completed.

The previous debate on this development in June of last year was triggered by a regrettable and unacceptable breach of planning, when works started at the site in April 2017 without the planning conditions being discharged. The site was restored to its original state by September 2017 and EirGrid and ESB Networks have since reviewed their processes internally to ensure such an oversight does not occur in the future. Following a commitment I made during the debate, my colleague, the Minister for Justice and Equality, and I attended a meeting with members of the community on 18 January 2018. At the meeting, the Ratheniska, Timahoe, Spink and surrounding areas substation action group outlined aspects of the project with which it was dissatisfied. These aspects covered issues of concern from the origins of the project in 2009 to the present day. I listened carefully to the many views expressed and I undertook to further consider the issues raised. After the meeting, my officials set about examining these issues and to that end they have engaged with EirGrid, the Commission for Regulation of Utilities and other parties. In response to Deputy Fleming, I asked that those issues be addressed. My officials followed them up with EirGrid and the other agencies. I gave a copy of the report to Deputy Fleming when it was presented to me.

I will relay the Deputies' request for a meeting and associated comments directly to EirGrid. I do not have the requested information in regard to the tender documentation. As much documentation as possible should be put into the public domain and I will also relay that request to EirGrid.

I will follow up the point raised by Deputy Stanley in regard to the correspondence from the committee with my office and ensure it is responded to.

Local groups have claimed that the aquifer in the area is being harmed. Water hydrology was fully considered in section 8 of the environmental report submitted with the planning application, which is available on the EirGrid website. It states:

Although for the wider groundwater body hydraulic continuity exists between the Sand and Gravel deposits and the bedrock aquifer, within the localised site area any groundwater in the sand and gravel deposits is not expected to be in hydraulic continuity with the bedrock aquifer underlying the site. This is due to the presence of a proved significant thickness of low permeability Clay deposits, with between 2.7m to 6.8m of clay proved beneath the Sand and Gravel deposits. The clay encountered during the investigations is described as stiff to very stiff at depth, and this stiff clay will impede any vertical groundwater flow.

The aquifer was discussed as part of the oral hearing in 2013. During the examination of the issues raised, the Geological Survey Ireland, GSI, groundwater expert carried out a desktop review of the issue and provided a report. In summary, the GSI confirmed that a locally important sand and gravel aquifer underlies the region around the site of interest and noted that the proposed development is outside of any known groundwater drinking water supply source protection zone. I hope that clarifies the issue on the aquifer.