Schools Building Projects Status

10:50 am

Photo of Richard BrutonRichard Bruton (Dublin Bay North, Fine Gael) | Oireachtas source

I will not involve myself in the local political issue the Deputy is raising. The problems that arose in this case were with the design team and had nothing to do with the Department. The school is back on track. The design team will submit a revised mechanical and electrical report and some important changes to the tender document by the end of May. The amendments are designed to ensure public works contracts protect small contractors when tender documents are being drawn up.

11 o’clock

That will then allow the case to proceed to tender. The Department has given a timeline on that so the school can know the basis of its planning. This is being handled in the way that every other school is handled. A priority is given to this school because it is an important school but there have been difficulties with it and I recognise that. I think those difficulties are now overcome and we are proceeding with the project.

Comments

No comments

Log in or join to post a public comment.